Abbey Farm in the townlands of Inishlounaght and Ballingarrane South, to the south of Cahir Road (R707) and to the west of the Gort Na Manach estate, Clonmel
Proposed development
Development which will consist of the following on a site with a total area of c.3.13ha: a) 96 no. (semi-detached, detached, and terraced) houses comprising 7 no. 2-bed houses, 53 no. 3-bed houses and 36 no. 4-bed houses; b) a two-storey childcare facility with a total gross floor area of c. 369 sq.m and an associated outdoor play area of c. 257 sq.m; c) the provision of public open space comprising 3 no. spaces including play equipment, and the provision of private open space for the proposed houses; d) a total of 206 no. car parking spaces comprising 185. no. residential spaces, 8. no. visitor spaces, 6 no. creche staff parking spaces and 7 no. creche drop off spaces; e) vehicular site access to the northeast of the site to the north of the existing residential area of Gort na Manach, and a pedestrian connectivity link along the eastern boundary to the existing residential area of Gort na Manach. Provision for 2 no. potential future access links on the southeastern and western boundaries; f) the proposed development also includes all associated landscaping and planting, boundary treatments, road and cycle infrastructure, bicycle parking for residents, visitors, and the childcare facility, scooter parking, EV parking and ducting, public lighting, drainage works, SuDS features and all associated and ancillary site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 10 Dec 2025
- Residential units
- 96
- Floor area
- 11377.7 m²
Timeline
Application received
24 Jun 2025
Council asked for further information
18 Aug 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
9 Oct 2025
Decision due
10 Dec 2025
Decision: conditional
9 Dec 2025
Appeal decided: conditional (PL-500527-TY-25)
19 May 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the extension and renovation of existing dwelling house including elevational changes and all associated site development works
the construction of a residential housing estate. The development will consist of the construction of a 55-unit residential estate, comprising: 10 no. semi-detached 4-bedroom 2-storey houses; 32 no. semi-detached 3-bedroom 2-storey houses; 1 no. detached 2-bedroom single-storey house; 2 no. 2- storey terraced blocks containing 4 No. 2-bedroom mid terrace townhouses and 4 no. end of terrace 3-bedroom townhouses; and 1 no. 2-storey maisonette apartment block containing 4 no. 2-bedroom apartments. Other works as part of the development will include: (a) connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097, and (b) the adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout
the construction of a residential housing estate to the rear of Gort Na Manach, Cahir Road, Inishlounaght T/D, Clonmel, Co. Tipperary. The works are summarized as – 1. Construction of a 55-unit residential estate, 2. The development will include: a. 10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3- bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities- permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works
the construction of a residential housing estate. The works are summarized as, 1. Construction of a 55-unit residential estate. 2. The development will include, a.10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3-bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. 6. An Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report have been submitted with the application
single storey extension to the side (South) of dwelling, conversion of attic to storage areas, with associated rooflights and minor alterations to rear (East) and side (South) elevations
the side conservatory and closing in of the front porch including all associated site development works