Croan Lodge, Coleville Road, Clonmel Co. Tipperary
Proposed development
Changes to planning application Ref No. 19601306 to comprise of alterations to approved site boundary and site development works and construction of new vehicular entrance onto proposed access roadway (as granted under Strategic Housing Development Ref. No. ABP-320189-24) in lieu of approved shared entrance
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 12 Mar 2026
Timeline
Application received
13 Jun 2025
Council asked for further information
30 Jul 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
28 Jan 2026
Decision due
12 Mar 2026
Decision: conditional
9 Mar 2026
Grant issued
12 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
development which will be Phase 1 of a two-phase residential development and will consist of the following on a site with an application area of c. 2.09 ha: 27 no. two-storey houses (detached, semi-detached, and terraced) comprising 1 no. 4-bed house and 26 no. 3-bed houses; 18 no. apartments in 1 no. split-level apartment building over three and four stories comprising 2 no. 3-bed apartments, 5 no. 2-bed apartments, and 11 no. 1-bed apartments; 1 no. single-storey bin store & 1 no. single-storey bicycle store; the provision of public open space, communal open space for the apartments, & private open space for the apartments and houses; a total of 83 no. car parking spaces comprising 74 no. residential spaces & 9 no. visitor spaces; vehicular, cycle, and pedestrian access to the development site from Davis Road along with a single vehicular access to house no. 27 from Powerstown Road; and all associated landscaping and planting, boundary treatments, road and cycle infrastructure, bicycle parking, EV parking and ducting, public lighting, drainage works, SuDS features and all associated and ancillary site development works. The site is located within a Zone of Archaeological Potential, and two Recorded/National Monuments (Enclosures TS083-023001 and TS083-023002) are located within or immediately adjacent to the development site
extension of the existing warehouse including all associated site works and new signage to provide extra storage at the premises
development which will consist of 115 no. residential units comprising 5 no. 3 storey blocks with 14 no. 1 bed apartments, 9 no. 2 bed apartments and 24 no. 3 bed duplexes; and 68 no. 2 storey houses (24 no. 2-bed houses, 24 no. 3-bed houses and 20 no. 4 bed houses). A 2-storey creche (c.208 sqm), 181 no. car parking spaces, 366 no. cycle parking spaces, open spaces, bin stores and ESB substations. The proposal includes for a new vehicular and pedestrian access and upgrades along the Coleville Road (R680). All associated site development works (including site reprofiling), landscaping, boundary treatments and services connections
1) demolition of existing garage to side of house and existing rear extension, 2) construction of new single storey rear extension, 3) alteration of the existing elevations including changing windows and doors, 4) change of existing single storey roof to flat roof, 5) construction of new canopy to front elevation, 6) widen existing entrance and all associated site works
1) demolition of existing garage to side of house and existing rear extension, 2) construction of new single storey rear extension, 3) alteration of the existing elevations including changing windows and doors, 4) change of existing single storey roof to flat roof, 5) construction of new canopy to front elevation, 6) widen existing entrance and all associated site works
1) demolition of existing garage to side of house and existing rear extension, 2) construction of new single storey rear extension, 3) alteration of the existing elevations including changing windows and doors, 4) change of existing single storey roof to flat roof, 5) construction of new canopy to front elevation, 6) widen existing entrance and all associated site works