Monroe Newtown, Nenagh, Co. Tipperary
Proposed development
Removal of an existing single storey extension to side and shed to rear; removal of 2 no. chimney stacks from the existing roof; modification and remodelling of the existing bungalow dwelling house on the site to include the construction of a single storey extension to the rear together with a new single storey extension to side; provision of an accessible mezzanine level containing a home office and store room to part of the new extension to side; removal of existing septic tank and associated percolation area; the construction of a new wastewater treatment system and associated new percolation area; construction of a detached, single storey garage; new hard and soft landscaping and the carrying out of all associated site works necessary to facilitate the development
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 7 Jun 2025
Timeline
Application received
13 Apr 2025
Decision due
7 Jun 2025
Decision: conditional
4 Jun 2025
Grant issued
8 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the demolition of the existing adjoining shed and garage and the construction of a new single-storey extension to the side of the existing dwelling house, together with all associated site works
extension to property as constructed and modification of garage roof from pitched to flat roof
1) increasing the car park area; 2) removal of an existing prefab, oil tank, cabin and shed; 3) construction of a new ball court; 4) resurfacing of the existing tarmac; 5) construction of a new drainage layout
1) increasing the car park area; 2) removal of an existing prefab and oil tank; 3) construction of a new ball court; 3) resurfacing of the existing tarmac; 4) construction of a new drainage layout
1) Increasing the car park area, 2) The removal of an existing prefab and oil tank, 3) Resurfacing the existing tarmac area, 3) construction of a new ball court.
slatted cubicle house and associated site works for dairy cows