Turtulla, Thurles, Co. Tipperary
Proposed development
The demolition of an existing extension and for the construction of a new single and two storey extension and carport to the dwelling. The works will include the removal of existing farm buildings, the construction of a new shed and the renovation of the existing house including minor elevational alterations, installation of new foul treatment system as well as all associated site works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 21 Apr 2025
Timeline
Application received
25 Feb 2025
Decision due
21 Apr 2025
Decision: conditional
10 Apr 2025
Grant issued
14 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
an extension to the rear of dwelling consisting of a open plan kitchen/dining area and utility room etc, a store to the side of dwelling and a garden shed/store to the rear of site with all associated siteworks
open plan kitchen/diner, small single toilet and sink
a two storey dwelling, domestic garage, new site entrance, new secondary treatment system and soil polishing filter and all associated site works
1) extension to existing canteen at ground floor level with stair access to proposed upper level, 2) first floor extension to part of training facility incorporating extension to existing ground floor canteen seating area, 5 no. classrooms, tutors administration area and all associated facilities, 3) external fire escape stairway to rear yard and 4) elevational alterations for windows and escape door together with associated site development works
construction of a new extension to the rear and side of existing dwelling with minor changes to the existing front elevation of dwelling and all associated site works
construction of a free-standing dormer type dwelling and detached garage, external works will include a packaged wastewater treatment system and polishing filter, a new splayed entrance from the public road and realigned front boundary