Applegreen Motorway Service Area, Junction 7 (M7), Lackanavea Birdhill Co. Tipperary
Proposed development
A high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle bays & 4no. charging points (powered by renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) associated revisions to existing parking bays incl. relocation of lighting column, landscape renewal & revised parking bay markings (zevi compliant)
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
12 Feb 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
proposed development which will consist of: • expansion of the existing service station to accommodate a new HGV and coach parking area, vegetated infiltration basin and dog walking trail, • reconfiguration of the existing parking area to provide additional staff and customer car parking, • new extended canopy and provision of 3 new pumps islands. Also, ancillary works including: • part of canopy and pump under to be removed, • relocation of HVO tank and container, • landscaped areas, • new internal road and paths, • all associated site works
expansion of the existing service station to accommodate a new HGV and Coach parking area, vegetated infiltration basin and dog walking trail; reconfiguration of the existing parking area to provide additional staff and customer car parking; new extended canopy and provision of 3 new pumps islands; and ancillary works including: part of canopy and pump under to be removed, relocation of HVO tank and container, landscaped areas. new internal road and paths, all associated site works
a high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8 no. electric vehicle bays & 4 no. charging points (powered by 100% renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) landscape renewal & (v) revised parking bay markings (zevi compliant).
a high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle bays & 4no. charging points (powered by 100% renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) landscape renewal & (v) revised parking bay markings (zevi compliant)
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points, a new access road to the compound is also proposed, 3) the drive-thru coffee facility is a single storey building (204 sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point, 4) the proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24 sq.m of signage), 5) all associated site development works, including new lighting
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points, a new access road to the compound is also proposed, 3) the drive-thru coffee facility is a single storey building (204 sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point, 4) the proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24 sq.m of signage), 5) all associated site development works, including new lighting