MSD Ireland (Ballydine), Ballydine Kilsheelan Clonmel, Co. Tipperary
Proposed development
The development of a new purified water utility (PuW) building. The development will consist of: i) a new purified water utility (PuW) building with two no. levels, to provide a gross floor area of approximately 281 square meters and a maximum height of 15.0 meters at the building stair core; ii) all associated site development and ancillary works including modifications to footpaths, drainage and utility services, service connections to existing high-level piperacks and landscaping works. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 applies
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 7 Apr 2025
Timeline
Application received
11 Feb 2025
Decision due
7 Apr 2025
Decision: conditional
3 Apr 2025
Grant issued
7 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(I) Construction of a Control and Softener Building for process water, comprising of a floor area of approximately 156.6 sq. m and a maximum height of approximately 6.5 m and associated underground regeneration water sump tank with a capacity of approximately 36,000 litres. (II) Decommissioning and removal of 4 no. existing overground pressure filter tanks; installation of 4 no. replacement overground pressure filter tanks, each approximately 5.3 m maximum height and 20,000 litre capacity; associated access platform approximately 5.3 m maximum height; and associated concrete slab of approximately 106 sq. m. (III) Installation of 1 no. coagulation tank together with associated access platform with a maximum height of approximately 5.1 m, capacity of approximately 11,000 litres, and bunded concrete apron comprising of an area of approximately 21 sq. m (IV) Installation of 1 no. sulphuric acid tank and associated equipment, with a maximum height of approximately 4m and bunded area of approximately 56 sq. m. (V) Installation of 1 no. filtered water storage tank with a maximum height of approximately 6m and capacity of approximately 100,000 litres; and 1 no. saltwater vessel with a maximum height of approximately 4.9m and capacity of approximately of 10,000kg and bunded area of approximately 28 sq. m. (VI) All associated site development and ancillary works including provision of footpaths, road paving, drainage and utility services. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 applies
the construction of an MV electrical building. The development will consist of: i) a new MV electrical building to comprise electrical rooms over an under-croft level to provide a gross floor area of approximately 168.8 square meters and a maximum height of 4.76 metres to include grated steel access platforms; ii) all associated site development and ancillary works including modifications to footpaths, drainage and utility services, and ground works. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 applies
an extension to the existing factory 03 production building at the site at Ballydine, Kilsheelan, Clonmel, Co. Tipperary. The development will consist of: (i) a new 4 level extension to the southern elevation of the existing factory 03 building to provide a gross floor area of approximately 2,967 sqm and maximum height to parapet of 29.11m; (ii) all associated site development and ancillary works including modifications to internal roads, footpaths, underground drainage and utility services, provision of low level (height c. 0.5 m) retaining wall, adjustment of the existing high level piperacks/cable trays for connections into the proposed building and landscaping works. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 applies
the existing temporary carpark (contractor carpark facility) and associated existing service roadway and existing compound area, comprising a mix of existing stone base and also tarmac surface treatment, and including existing site lighting installations, existing fencing, existing smoking shelter and existing bicycle rack. We also wish to apply for permission to extend the existing carpark by circa 2m to the east to accommodate the construction of 178 no permanent carparking spaces (which includes for the designation of 17 no. new e-car charging carparking spaces and 1 no. new combined disabled/e-car charging carparking space), upgrade of the existing surface finish to a tarmac finish as applicable throughout, installation of line markings and kerbing, drainage works including the installation of a petrol/oil interceptor and attenuation system, adaption of existing site lighting as required ( including the replacement of all existing site lighting fixtures), the alterations of existing tree line, adaptation of existing compound area to form a secure delivery drop-off/short-term storage area, and all necessary alterations to accommodate the above works, complete with all associated site works and ancillary accommodation. The planning application is accompanied by a Natura Impact Statement (NIS). This application refers to a development on a site that carries out activity for which an industrial Emissions Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and where the major accident directive applies
the change of use of an existing storage facility to a 3D printing facility (manufacturing) with associated administration area/office, including new façade treatment and entrance canopy to the existing south-eastern elevation, new access doors to the north-eastern elevation, upgrade/replacement of all existing doors, new rooftop guardrail and roof ladder access system, new services compound, minor drainage works, new tarmac finish as indicated, and all necessary alterations to accommodate the works, complete with all associated site works and ancillary accommodation. This application refers to a development on a site that carries out an activity for which an Industrial Emissions License under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and where the Major Accident Directive applies
the existing contractor carpark facility and associated service roadway, comprising a mix of existing stone base and also tarmac surface treatment, including 8 no. existing lighting poles, smoking shelter and bicycle rack. Planning permission is also sought for the extension of the existing contractor carpark by 2m to the east, upgrading of the existing surface finish to a tarmac finish throughout, installation of line markings and kerbing to accommodate the construction of 178 no. permanent carparking spaces which includes for the designation of 18 no. new e-car charging carparking spaces and 1 no. new disabled carparking space, complete with all necessary drainage works and the replacement of all existing lighting poles, the alteration of existing tree line and all necessary alterations to accommodate the works, complete with all associated site works and ancillary accommodation. This planning application is accompanied by a Natura Impact Statement (NIS). This application refers to a development on a site that carries out an activity for which an Industrial Emissions License under PartIV of the Environmental Protection Agency Act 1992 (as amended) is required and where Major Accident Directive applies.