Poppyfield Retail Park, Cahir Rd Ballingarrane, Clonmel Co. Tipperary
Proposed development
An Electric Vehicle (EV) Charging Station on a site of ca. 0.017ha, consisting of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
31 Jan 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the extension and renovation of existing dwelling house including elevational changes and all associated site development works
the construction of a residential housing estate. The development will consist of the construction of a 55-unit residential estate, comprising: 10 no. semi-detached 4-bedroom 2-storey houses; 32 no. semi-detached 3-bedroom 2-storey houses; 1 no. detached 2-bedroom single-storey house; 2 no. 2- storey terraced blocks containing 4 No. 2-bedroom mid terrace townhouses and 4 no. end of terrace 3-bedroom townhouses; and 1 no. 2-storey maisonette apartment block containing 4 no. 2-bedroom apartments. Other works as part of the development will include: (a) connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097, and (b) the adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout
the construction of a residential housing estate to the rear of Gort Na Manach, Cahir Road, Inishlounaght T/D, Clonmel, Co. Tipperary. The works are summarized as – 1. Construction of a 55-unit residential estate, 2. The development will include: a. 10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3- bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities- permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works
the construction of a residential housing estate. The works are summarized as, 1. Construction of a 55-unit residential estate. 2. The development will include, a.10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3-bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. 6. An Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report have been submitted with the application
the side conservatory and closing in of the front porch including all associated site development works
a conservatory to the left hand side of the house