Ballyard Td, Birdhill, Co. Tipperary
Proposed development
To fill the existing poor quality agricultural land with inert materials comprising of Class 5 and Class 6 material (topsoil, subsoil, soil, recovered concrete and stone) in order to raise the level of the ground, provision of a temporary wheel wash on site, proposed access track, utilising existing site entrance including all ancillary site works - NIS submitted with application
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 13 Feb 2026
Timeline
Application received
11 Dec 2025
Decision due
13 Feb 2026
Decision: conditional
9 Feb 2026
Grant issued
15 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
filling the existing poor quality agricultural land with inert materials comprising of Class 5 and Class 6 material (topsoil, subsoil, soil, recovered concrete and stone) in order to raise the level of the ground, provision of a temporary wheel wash on site, utilising existing site entrance, including all ancillary site works at Ballyard Td, Birdhill, Co. Tipperary. The Assessment Screening Report and Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, at the offices of Tipperary County Council, during its public opening hours.
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance points, a new access road to the compound is also proposed, 3) the drive-thru coffee facility is a single storey building (204 sq.m) containing a beverage area, seating area, toilets and back-of-house area, along with an external enclosed refuse compound, car parking spaces, footpath, drive-thru lane, circulation area, landscaping and entry/exit point, 4) the proposed new signage consists of signage relating to the proposed drive-thru coffee facility and includes a combination of free-standing signage and signage on the building and height restriction barrier (total area of 30.24 sq.m of signage), 5) all associated site development works, including new lighting
installation of 6 no Tesla supercharges, 12 no chargeposts, revised parking layout, signage and a new MV substation including associated equipment and services