Newtown Upper, Faugheen, Carrick-on-Suir
Proposed development
Alterations to existing outbuilding to form granny flat with interconnecting door to main house, rear single storey extension to replace existing sunroom, alterations to entrance porch, replacement of non-original windows and renovation of original sliding sash windows, internal alterations at first floor to form master bedroom with walk in wardrobe, raising of floor level at first floor at existing side extension and new hipped roof over same extension and removal of existing chimney, new roof windows, new section of roof to eliminate valley at east elevation, replastering at proposed granny flat, removal of existing concrete water tank to rear of building, new vehicular entrance and all associated site works (at a protected structure)
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 9 Jan 2026
Timeline
Application received
23 Dec 2024
Council asked for further information
25 Feb 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
1 Jul 2025
Decision due
9 Jan 2026
Decision: conditional
6 Jan 2026
Grant issued
9 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the storage/kitchen area (137 sq.m), the temporary outdoor covered dining area (85 sq.m), temporary dining pods and hard landscaping (112 sq.m) and the existing carpark (410 sq.m) as constructed and associated entrance onto Newtown Manor. Planning Permission is also being sought for (a) the removal of the storage area and temporary structures and the replacement with a permanent extension of 577 sq.m including a restaurant (110.3 sq.m), a kitchen (138.8 sq.m) a function room (191.9 sq.m), an outdoor covered dining area (111 sq.m), toilets and ancillary circulation space; together with associated internal alterations to public house and first floor apartment; (b) upgrade works to the carparking area (including re-surface, line markings, etc.), and erection of a timber boundary fence to the eastern boundary; (c) decommissioning of existing on-site effluent treatment system and replacement with connection to public mains via proposed on- site pumping station; together with all associated works
a) Retention of storage/kitchen area (137 sq.m), retention of temporary outdoor covered dining area (85 sq.m), temporary dining pods and hard landscaping (112 sq.m) and retention of existing carpark (410 sq.m) as constructed and associated entrance onto Newtown Manor; b) Removal of storage area and temporary structures and replacement with a permanent extension of 577sq.m including a restaurant (110.3sq.m), a kitchen (138.8sq.m) a function room (191.9sq.m), an outdoor covered dining area (111sq.m), toilets and ancillary circulation space; together with associated internal alterations to public house and first floor apartment; c) Upgrade works to the carparking area (including re-surface, line markings, etc.), and erection of a timber boundary fence to the eastern boundary; d) Decommissioning of existing on-site effluent treatment system and replacement with connection to public mains via proposed on- site pumping station, together with all associated works
works carried out at our property comprising of the construction of a covered outdoor dining space, extension to rear of property for storage and staff circulation associated with the kitchen space, storage unit to rear of property, vehicular entrance opening to the South road facing boundary wall and hardcore surface area on site for the purpose of on-site parking and all associated site works
to refurbish existing dwelling house, along with the demolition of existing single storey element adjoining the dwelling, and 2 no out-houses to facilitate the construction of a 1.5 storey extension to the rear of the existing dwelling, complete with new septic tank and percolation system, improved existing entrance, and all associated site works