Cooleeney and Derryfadda, Moyne, Thurles Co. Tipperary
Proposed development
Building (3657 sq m) with a car park and access road, commercial yard area and access road, truck prep building (110 sq m), 2 m high boundary architectural fence, signage, public lighting, solar panels to the building roof, an on-site waste water treatment system and associated polishing filter bed percolation area, rainwater harvesting tank, emergency storage tank, attenuation tank, bored well and all associated site works - application is accompanied by a Natura Impact Statement (NIS)
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 13 Jul 2021
- Residential units
- 1
- Floor area
- 3657 m²
Timeline
Application received
19 May 2021
Decision due
13 Jul 2021
Decision: conditional
12 Jul 2021
Grant issued
13 Aug 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a) a calf rearing shed; b) Planning permission for the dismantling of an existing straw storage shed; c) Planning permission for the construction of a dungstead; d) Planning permission for the construction of a calf rearing shed with straw storage and underground slurry storage tanks and all associated site works
the construction of an agricultural shed to consist of 6 no. robotic milking units, ancillary rooms, underground slatted slurry and soiled water storage tanks and all associated siteworks
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha.
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works. The total development area will be ca. 77ha.
a 10 year planning permission for modifications to Condition No. 1 of previously granted planning permission Ref. No. 18/601296. The modifications comprise an outfall drain and associated pumping station and monitoring chambers to discharge surface water and treated waste water from the Biorefinery site through the townlands of Cooleeny and Derryfadda to the Drish River; a water supply pumphouse and associated site works including access road and security fencing in the townland of Derryville and a water supply pipeline from the pumphouse to the Biorefinery facility site. A Natura Impact Statement (NIS) will accompany the application. This application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence.
building 2 cubicle houses with slatted tanks including associated site works