Kilballyboy, Clogheen, Co. Tipperary
Proposed development
For items that were not built in accordance with Planning Application Reference number 04/466. The items to be retained are (i) the existing extension that was constructed to the existing dwelling (ii) the height of the detached garage and elevational amendments - all associated site development works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 1 Dec 2021
Timeline
Application received
7 Oct 2021
Decision due
1 Dec 2021
Decision: conditional
30 Nov 2021
Grant issued
12 Jan 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
1. the additional floor area as constructed including the first floor development in the south facing single storey section, 2. the first-floor window on the south facing elevation, 3. the first-floor window on the north facing elevation, 4. the location / orientation of the dwelling on site, all from that as previously granted under planning reference number 02/545 and for PERMISSION to complete the dwelling house including the proposed changes to the roof elevations and the ridge heights with all associated site works
(1) the Demolition of existing Greenhouses and adjacent (smaller) Shed and (2) the construction of a Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works
a). develop extension to rear of existing dwelling, b). convert existing garage/office to a bedroom and construct a link to the main dwelling, c). refurbish and alter existing dwelling and all associated site works
a) extension to rear of existing dwelling and link to side connecting main dwelling to separate structure, b) refurbish and alter existing dwelling and all associated site works
an amendment to an existing permitted telecommunications development (reg ref 19600347) by replacing the existing 20m monopole with a multi-user lattice tower of 21m in height incorporating a mounting frame to facilitate the transfer of EIR Mobiles telecommunications equipment and accommodate future operators to provide enhanced mobile services and next generation broadband in the area. The structure will also accomodate Tetra antennas at the summit for emergency services broadcast. The existing 2.4m palisade fence compound will be expanded by 80m2 to facilitate the new structure, additional cabinets and ancillary equipment with access continuing over an existing track within the Coillte Forest
conversion of existing garage to a single occupancy community dwelling including changes to exterior elevations, construction of a 2 metre high fence to form private garden and addition of 2 car parking spaces to front