Doon, Gurteen, Co. Sligo
Proposed development
(1) Demolish existing dwelling house on site (2) replace existing dwelling house with a new a single story dwelling house, (3) decommission existing Septic tank and percolation area and install a new proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services
- Applicant
- Not published
- Authority
- Sligo County Council
- Decision due
- 23 Dec 2026
- Residential units
- 1
- Floor area
- 134.67 m²
Timeline
Application received
29 Oct 2026
Last day for public submissions (est.)
Wed 2 Dec 2026
Decision due
23 Dec 2026
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Planning Permission to (1) Demolish existing dwelling house on site (2) replace existing dwelling house with a new a single story dwelling house, (3) decommission existing Septic tank and percolation area and install a new proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services at Doon, Gurteen, Co. Sligo.
Retention of: 1. Roof projections at bay windows on front elevation of existing dwelling 2. Quoin details on external corners 3. 3No velux windows on rear of roof 4. Domestic garage as constructed and all ancillary site works.
Development consisting of demolition of an existing dwelling house with outbuildings and to replace it with a new dwelling house and garage with septic tank and percolation area and associated site development works.
for development consisting of 1. Permission to retain extensions to south east and north west elevations. 2. Permission to construct extension to the rear. 3. Permission to alter windows and doors to the front and rear elevation. 4. Permission to upgrade the existing wastewater treatment system in accordance with section 6.6 of the EPA CoP "Wastewater Treatment and Disposal Systems serving Single houses (p.e ¡Ü 10)", and all associated site development works
for development consisting of a new kitchen, dining room, utility room, and alterations to front and rear windows and doors, also retention for 2 no. bedrooms, (1 unsuite), dining room, sitting room, and corridor. Upgrade existing wastewater treatment system in accordance with Section 6.6 of the EPA CoP "Wastewater Treatment and Disposal Systems serving single hosues (p.e. = 10)", and all associated site development works
for development consisting of the construction of a dwelling house, entrance by boundary, install a packaged wastewater treatment system with soil polishing filter and carry out ancillary development works