Rathlee, Easky, Co. Sligo
Proposed development
Construct new dwelling house, proprietary effluent treatment plant and percolation area, together with all associated site works
- Applicant
- Not published
- Authority
- Sligo County Council
- Decision due
- 10 Sept 2026
- Residential units
- 1
- Floor area
- 0.268 m²
Timeline
Application received
17 Jul 2026
Decision due
10 Sept 2026
Decision: conditional
3 Sept 2026
Grant issued
6 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development consists of 1. Construction of new Community Centre. 2. Installation of onsite wastewater treatment system and percolation area. 3. Provide disabled compliant car parking bay and general parking to the proposed Community Centre by extending existing Church car park. 4. Carryout all associated and ancillary works.
The development shall consist of the following: Removal of existing glazed porch and replace with new block-built porch. with lean-to roof and rooflight, finish to match existing. Proposed rear extension with flat roof and lean-to roof. Replace defective flat roof covering with new membrane anthracite grey in colour. Provision of new rooflights to existing flat roof. Alterations to rear elevation including removal of existing windows and portion of blockwork to provide new windows and door. Removal of existing internal walls fireplace and chimney. Addition of new pitched roof on roadside elevation in place of existing flat roof.
Development consisting of recessing existing roadside boundary - facilitating the construction of car parking/set down area. Proposed works will consist of: (1) the removal of existing roadside boundary wall; (2) construction of car parking/set down areas; (3) construction of new recessed boundary wall and pedestrian footpath; (4) carrying out of all associated ancillary site works
(1) demolition of existing derelict dwelling, (2) construction of a new single storey dwelling house, (3) installation of a new septic tank and percolation area and (4) connection to existing public water supply
Development consisting of maintenance of the existing shop as a retail unit to let, to repair and extend the roof over the shop to join the main house, relocate the existing front garden wall inwards to allow the street footpath to continue across the front of the site, to mark the existing parking to the front to formalise two car spaces plus one accessible space. Application for tea-room street furniture to the front, conversion of the existing street front workshop to a professional kitchen, adding 0.89m to the roof level to allow for a mezzanine storage level, maintaining the rear ground floor storage and conversion of its first floor storage to studio apartment for staff, extending the coal shed to be toilet facilities for the Tea Rooms. Change-of-use of the existing house to a B&B plus staff facilities to include staff room, showers, kitchenette, and all ancillary site works including new percolation areas, rainwater harvesting and drainage.
Development consisting of (1) Retain fenestration changes and additional windows to side and rear elevations (2) Convert attic to habitable rooms including velux windows, (3) Install septic tank, treatment modules and percolation area (4) all ancillary site works. (Previous application PL05/778 refers)