ESB Telecoms Ltd Telecommunications Compound, ESB's Sligo 110kV Substation Tullynagracken South, Carrowroe Co. Sligo
Proposed development
Permission for the installation of solar panels on a steel frame structure within an existing telecommunications compound (panels to cover an area of approximately 48 sq.m., to a maximum height not exceeding 4.4 metres above ground level). Works to include all ancillary development works.
- Applicant
- Not published
- Authority
- Sligo County Council
- Decision due
- Not available
Timeline
Application received
3 Jun 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a single story dwelling house, garage, proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services
A new 232.8m2 Dwelling and a 46.4m2 Garage, Dwelling Consisting of 4 bedrooms, 1 Office Space, 1 en-suite, a walk in wardrobe, plant room, A Sitting Room, Open space Living, Dining and Kitchen area, a Utility and 2 Bathrooms, Drainage and Foul Water Treatment system with Raised Bed percolation system, A new entrance and all other associated Site works
Albert Higgins chairman, on behalf of Carraroe Community Development Association intend to apply for planning permission for (1) the construction of a new Astro Turf Pitch (2) all associated Floodlights and fencing (3) all associated site works, all at St Johns Park Cuilbeg & Carrownamddoo, Carraroe, County Sligo.
(1) construct a one storey building, including changing rooms, a recreation space and ancillary spaces; (2) replace the existing wastewater system with a new tertiary waste water treatment system; and (3) conduct all associated site works
permission for the construction of a single-storey 3-classroom extension with ancillary accommodations and associated site work
development consisting of erection of a modular unit to be used as a car rental hub along with the construction of an adjoining canopy to be used as a car wash/valeting bay. Site works to consist of a new entrance and exit, car parking, EV charging spaces, landscaping, bicycle rack, lighting, signage, new wastewater treatment system / soakpit, connection to public water mains, and all ancillary works