75 Crozon Park, Crozon, Sligo
Proposed development
Retain single storey utility extension constructed to side of dwelling and detached shed erected to side of dwelling with all associated works
- Applicant
- Not published
- Authority
- Sligo County Council
- Decision due
- 16 Apr 2026
Timeline
Application received
20 Feb 2026
Decision due
16 Apr 2026
Decision: conditional
10 Apr 2026
Grant issued
13 May 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
PERMISSION for development at the Former Summerhill College, Circular Road, Sligo, F91 YY30, bounded to the west by Ray McSharry Road. The property is a Protected Structure Ref. No. 29 SE and is adjacent to the curtilage of other Protected Structures Ref. Nos. 35 SE, 181 SE, 182 SE and 183 SE. The proposed development will consist of the following: (1) Change of use from a former educational institution incorporating teaching accommodation, residential dormitory accommodation and associated ancillary facilities to student accommodation, including associated communal, study, amenity and ancillary facilities. (2) Material alterations to the interior of the premises to facilitate the proposed change of use, including removal of modern internal partitions, ceilings and redundant services. (3) Formation of student bedroom accommodation, including ensuite and mezzanine accommodation, together with associated communal, study, social and ancillary spaces and associated services. (4) Installation of a new internal accessible lift together with associated localised works. (5) Repair, replacement and renewal of derelict and dilapidated roof structures and coverings, particularly in and around the former kitchen area. (6) External works including covered cycle parking, reorganisation of existing hard-surfaced areas for car parking, external amenity and smoking shelter areas, landscaping, services and associated site development works. (7) Repair and conservation of existing historic façades, roofs and other architectural features, where applicable.
The change of wall type, from Block wall with Brick Piers as permitted, to a Concrete post and plinth fence, with elite Smart fence infill panels.
Permission for retention of change of use and alterations to elevations and plans of vacant commercial premises to use as 3 single storey dwelling units and all associated works at 1-3 Burton Street, Sligo.
The development will consist of the retention of alterations to the carparking, astroturf pitch, playground, open space, landscaping, bike shelters, ESB substation previously granted planning under planning reference PL20/445 and the change of use to accommodation for protected persons at Globe House and the former Novitiate building and all associated site works and services within the curtilage of a protected structure RPS Ref 12 SE and 13 SE / NIAH 32012037 as identified in the Sligo County Development Plan 2024-2030.
Change of use from office to 3 bed dwelling
for the retention of the following works: 1. The retention of the as-built gable end roof to the North facing elevation of the building, constructed in lieu of the hipped roof, granted under planning reference no. 22197 and all ancillary works.