Carns, Culleens, Co. Sligo
Proposed development
The construction of an extension to existing dwelling house, alterations to front elevation, new site entrance and on-site wastewater treatment system together with ancillary site development works
- Applicant
- Not published
- Authority
- Sligo County Council
- Decision due
- 12 Feb 2026
Timeline
Application received
11 Sept 2025
Council asked for further information
23 Oct 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
16 Jan 2026
Decision due
12 Feb 2026
Decision: conditional
3 Feb 2026
Grant issued
6 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to: (1) Construct a single storey extension to the side and rear of the existing cottage, along with modifications to the front, side and rear elevations, (2) Relocate the site entrance, (3) Install a wastewater treatment system and percolation area and, (4) Carry out all ancillary site works
Planning Permission to: (1) Construct a single storey extension to the side and rear of the existing cottage, along with modifications to the front, side and rear elevations, (2) Relocate the site entrance, (3) Install a wastewater treatment system and percolation area and, (4) Carry out all ancillary site works at Tullylin Td., Castleconnor East E.D., Co. Sligo.
(1) Construct a single storey extension to the front and side of the existing cottage, along with modifications to the front, side and rear elevations, (2) Relocate the site entrance, (3) Install a wastewater treatment system and percolation area and, (4) Carry out all ancillary site works
the demolition of existing derelict dwelling house and the construction of a new dwelling house, new site entrance. and on-site wastewater treatment system together with ancillary site development works
development consisting of raising the level of approximately 1.76 hectares of excavated land within a disused quarry by importing approximately 100,000 tonnes of inert soil and stone and all associated site works over a five year period. A waste facility permit will also be required.
for development consisting of the replacement of the existing prefabricated timber chapel building with a permanent structure circa 80m2 floor area, the usage to continue for religious and adoration purposes. Planning is also sought to retain the septic tank and percolation area, the station of the cross, the statue of the Blessed virgin complete with its enclosing building, hardstand areas, front boundary wall and access onto the public road all at