Washington House, Cregg Rosses Point, Co. Sligo
Proposed development
Re-construction of an outdoor pergola area to include glazing, replacement of existing front door and entrance gate, and all associated works
- Applicant
- Not published
- Authority
- Sligo County Council
- Decision due
- 2 Apr 2025
- Residential units
- 1
- Floor area
- 25 m²
Timeline
Application received
6 Feb 2025
Decision due
2 Apr 2025
Decision: conditional
25 Mar 2025
Grant issued
28 Apr 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
1) Construction of an extension to the existing agricultural shed for storage purposes; 2) Construction of horse stables and a tack room; 3) Construction of an outdoor horse riding arena with associated fencing; 4) Construction of a roofed manure pit and soiled water tank; together with all associated ancillary site development works.
to retain detached building to rear of an existing dwelling house
construction of a single story two car garage to the rear of the existing property together with all associated site works. The gross internal floor area of the proposed garage is to measure 114 square meters
A new energy centre comprising a boiler house, heat pump and gas enclosure (combined area 150m2) and ancillary site works.
(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the front of the dwelling; (c) the construction of a storey and a half detached leisure building, (d) the creation of a new site entrance from the public road with gates and pillars, (e) the installation of a new tertiary treatment system with infiltration/treatment area and (f) associated site works.
Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of ground mounted solar PV. It Is envisaged that Phase 2 will progress in tandem with the facilities planned electrification of their heating system over the coming five (5) years. Included In this application is a visual impact assessment, an appropriate assessment screening, an ecological impact assessment report, a glint & glare assessment & an archaeological impact assessment.