Cedar Lodge, Ballincar, County Sligo
Proposed development
To demolish of one redundant boiler chimney (east elevation), removal of existing pop-out pitched roof and replacement with a flat roof (south elevation), refurbish dormer (east elevation), garage conversion (east elevation), construction of new extension and terrace to the rear (south elevation), provision of skylights (east elevation), replace existing cladding with render (north elevation), alteration to porch depth, alteration to porch and first floor openings (north elevation), provide a new connection to the public effluent treatment system and all associated site works and services
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Sligo County Council
- Decision due
- 30 Jan 2025
- Residential units
- 1
- Floor area
- 172 m²
Timeline
Application received
27 Nov 2024
Decision due
30 Jan 2025
Decision: conditional
28 Jan 2025
Grant issued
28 Feb 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of: Construction of 3No. new dwelling houses and all associated works which will include: 1.) House 1: Detached single storey plus dormer level dwelling house with storage shed; 2.) House 2: Detached single storey plus dormer level dwelling house with storage shed; 3.) House 3: Detached single storey plus dormer level dwelling house with storage shed; & 4.) the construction of new vehicular entrances to each house from the existing access road to the west of the site and all associated site works and service connections. This planning application is accompanied by a Natura Impact Statement (NIS).
1) Construct a lean-to glazed annex to the rear, 2) Construct a glazed conservatory to the northwest elevation, 3) Construct a first-floor extension to the northeast elevation, 4) Install a new pitched roof onto the existing single story flat roof extension on the northeast elevation, 5) Install a new door and window in lieu of an existing window on the south elevation, 6) Remove bedroom to extend existing W.C. on the first floor 7) Install new packaged intermittent filter modules and infiltration area and connect to existing septic tank and, 8) Carry out all ancillary site works
Retention of the following: Construction of 2nr additional dormer windows on the rear (northern elevation). Omission of 1nr original dormer window and replacement with a roof window in-lieu on the rear (northern elevation). Alterations to fenestrations on sides and rear elevations as constructed, Alteration to front porch roof from hip to ‘A’ roof design. Alteration of hip on rear roof to ‘A’ roof design. Addition of 2nr roof windows on the eastern & western roof planes of rear roof structure serving stairwell / landing area. Extension to the rear of the existing kitchen which includes a new link corridor to existing hallway and the erection of a new rear porch entrance at the basement level (northern elevation) & Planning Permission for the following:To construct of a new on-site PET system with percolation area to replace the existing FW discharge system. Reconnection to existing site services & All associated site development works deemed necessary
Planning Permission to: 1) Construct a lean-to glazed annex to the rear, 2) Construct a glazed conservatory to the northwest elevation, 3) Construct a first-floor extension to the northeast elevation, 4) Install a new pitched roof onto the existing single story flat roof extension on the northeast elevation, 5) Install a new door and window in lieu of an existing window on the south elevation, 6) Remove bedroom to extend existing W.C. on the first floor and, 7) Carry out all ancillary site works at 1 Ballincar Heights, Ballincar Td., Rosses Point, Co. Sligo. F91NN27.
Full Planning Permission for the installation of 2 no. modular, portable Padel tennis courts, complete with artificial grass surface, 4m high fencing around sections of the Padel courts perimeter and 6m high integrated LED lighting and all other ancillary site works
new residential development that includes 12 new dwelling units, comprising of 2 no. 5 bedroom houses, 6 no. 3 bedroom houses, 2 no. 2 bedroom apartments, 2 no. 1 bedroom apartments, associated private, communal and public open space, signage, works to site boundaries, creation of new pedestrian link and access road, associated car and bicycle parking, service connections and all other associated site works and services