ObjectRight
Back to search
2560175Awaiting decisionretention

Chalet 3 Barry More Townland, Hodson Bay, Athlone

Not open for objections: The council has marked this application invalid or closed.

Proposed development

Retention Permission and Permission: retention for the development of a maintained and improved chalet structure, boundary treatment, gated access and a proposed new level access on a site of 0.11 Ha. The retained works and development are as defined and confined to ABP Reference: 313742, refurbished chalet, boundary and gate. The new proposed development comprises the replacement of the existing level access stone finish and its removal and replacement with the insertion of a modular, cellular grasscrete parking surface at

This description looks cut short in the national planning register. Read the full description on the council's file

Applicant
Not published
Authority
Roscommon County Council
Decision due
Not available
Residential units
1
Floor area
88.65 m²
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    18 Apr 2025

  2. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The council has marked this application invalid or closed.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2262Granted on appeal

Permission for development consisting of the following recreational facilities: Part A. Landside installations details of which are outlined below: 1. 2 No. marquees for use as a reception and wet suit distribution, measuring 9m X 9m X 6.6m high and 21m X 15m X 7.8M high; 2. 1 No. 9m X 9m X 3.8m high disabled changing marquee; 3. 1 No. 9m X 9m X 4.7m high safety briefing marquee; 4. 9 No. 12m X 6m X 3.3m high changing marquees; 5. 3 No. 12m X 15M X 5m high marquees for use as a customer observation area, a dining area and a gift shop; 6. 1 No. 4m X 8m X 3.7m high café marquee; 7. 2 No. 3m X 6m X 3m high prefabricated office buildings; 8. Outdoor showers 5m X 6m; 9. Realignment of existing fencing. All the marquees will be coloured white. The proposed development includes all ancillary and enabling site works. The changing rooms and coffee shop will be connected by gravity to existing public sewerage. Part B. Waterside Installations, details of which are outlined below: 1. Main waterpark consisting of inflatable platforms, slides and climbing walls with overall dimensions of 35m X 40m X 8m high; 2. Inflatable junior waterpark measuring 8m X 15m X 5.2 high; 3. No. 1 inflatable water slide measuring 15m X12m X12m high; 4. No. 1 inflatable water slide measuring 31m x 22m x 16m high; 5. No. 1 inflatable water slide measuring 20m X 8m X 13m high; 6. No. 1 inflatable water slide measuring 32m X 16m X 13m high; 7. 50 No. cylindrical shaped inflatable safety booms 4m by.4m diameter. All of the above installations are inflatable PVC structures which are permanently fixed to the lake bed using ropes and anchors. Proposed Operation Periods: It is intended that the overall facility will be operational annually between the 15th March and the 15th of October. The facility will operate during daylight hours only and will not operate past 21:00 hours on any day (a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application) at

Barrymore Townland, Hodson Bay, Kiltoom Athlone Roscommon County Council Received 9 Feb 2022