Drishogue, Carrick-on-Shannon, Co. Roscommon.
Proposed development
Planning Permission to erect an extension to Retail Unit No. 6 and connect to existing services, also for the removal of Condition No. 22 of previous granted permission Ref. No. PD/04/2480 and all associated works at
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Roscommon County Council
- Decision due
- 8 Jun 2025
Timeline
Application received
14 Apr 2025
Decision due
8 Jun 2025
Decision: refused
6 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (extension or alterations to a home) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
Permission for development at Lidl, Drishoge, Carrick-On-Shannon, (and adjoining land to the south-west), consisting of the construction of a new Discount Foodstore Supermarket with ancillary off-licence sales, on an extended site. The proposed development comprises: 1) The demolition of existing single storey Discount Foodstore (with ancillary off-licence use) measuring 1,756 sqm gross floor space with a net retail sales area of 1,286 sqm; 2) The construction of a single storey Discount Foodstore Supermarket with ancillary off-licence use (with mono-pitch roof and internal mezzanine plant deck) measuring 2,619 sqm gross floor space with a net retail sales area of 1,815 sqm; 3) Redevelopment / reconfiguration of existing site layout including revised car parking area, and hard and soft landscaping areas; and, 4) Provision and/or renewal of boundary treatments, free standing and building mounted signage, trolley bay enclosure, refrigeration and air conditioning plant and equipment, electricity sub-station and switch room, public lighting, electric vehicle charging infrastructure, roof mounted solar panels, cycle parking, modification of existing drainage, utility and services infrastructure and connections, waste storage facilities, and all other associated and ancillary development and works above and below ground level at
Permission for a warehouse/storage extension to the existing Retail Unit No. 6 at West Gate Business Park, together with connection to existing services and all associated site development works. The extension will provide additional internal storage space, including for the secure storage and charging of battery-powered equipment at
Permission for the installation of a gated vehicular access including ancillary development works, from the L5081 road to the southern portion of the telecommunications compound, to enable the siting of a standby generator on an area of existing hard standing for use on a temporary basis during periods of electrical outages at
Permission for development of Phase 1 of new club facilities to include: 1 no astro turf playing pitch & flood lighting (6 no 15m high poles with 14 x 1.5kw floodlights), 1 no astro turf training pitch & floodlighting (6 no 10m high poles with 8 x 1kw floodlights), parking area, perimeter walking track, perimeter fencing to pitches, changing facilities (temporary), new access onto the public road, connection to services and all associated site development works at
Development of Phase 1of New Club Facilities to include 1 No Astro Turf Playing Pitch & Flood Lighting, 1 No Astro Turf Training Pitch & Floodlighting, Parking Area, Perimeter Walking Track, Perimeter Fencing to Pitches, Changing Facilities (Temporary), New Access onto the Public Road, Connection to Services and all associated site development works at
Permission for the construction of 14 no. dwelling units across four terraced blocks, new pedestrian and vehicular access into the site, internal roads and paths, boundary treatments, public lighting, services infrastructure and all ancillary site and development works at