Kilcash, Roscommon, Co. Roscomnon.
Proposed development
Permission for a development relating to the: • The construction of one Enercon E138 Wind Turbine on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m • Installation of the hardstanding area for the Wind Turbine. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c.282m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m 2 and c.5m in height; • Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. • All associated ancillary infrastructure and preparatory works such as provision of the site entrance The power rating associated with the proposed wind turbine will be 4.2 megawatts (MW). The proposed Project will have a 30-year lifespan. A Natura Impact Statement has been prepared as part of this planning application at
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Roscommon County Council
- Decision due
- 6 May 2024
Timeline
Application received
29 Sept 2023
Council asked for further information
23 Nov 2023
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
2 Feb 2024
Decision due
6 May 2024
Decision: conditional
3 May 2024
Appeal decided: conditional (ABP-319800-24)
10 Feb 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (solar or wind energy) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
The Planning Application is subject to Section 34D of the Planning and Development Act 2000 (as amended) and in accordance with Article 16(2) of the Renewable Energy Directive III (Directive 2023/2413) i.e. Completeness Check. Permission for development, which consists of an amendment to the previously consented development (Ref. 2360142 & ACP. PL20.319800): • The construction of one Enercon E138 Wind Energy Converter on a 99.79m tower with an electrical rating of 4.5MW and an overall tip height of 168.9m; • An amendment to substation design, changing from a block-built to a modular design comprising of 2 single-storey prefabricated modules surrounded by stock proof fencing; an ESB module measuring 14.33 m² and height of 3.41m and an IPP module measuring 33.31 m² and 3.89m in height; • An amendment to the statutory redline boundary to incorporate the following; • 20kV overhead line (OHL) and underground cable (UGC) between the permitted IPP substation and the point of connection to the national grid, comprising c.507m of OHL across private lands and c.985m of UGC within the L7135 and • All associated ancillary infrastructure and preparatory works such as the provision of the turbine delivery / haulage route, site access track and the provision of the new site entrance from the L7086. The operational lifespan of the development will be 35 years from the date of commercial operation. This planning application is subject to a Natura Impact Statement (NIS). This development is covered by the provision of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application is subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. This application is for a 10-year planning permission for a development with a total site area of 12.33 hectares, located in the townlands of
Permission for a change of house design, as previously granted under PD/21/349 and all associated site works at
Permission for the proposed Project relating to: •The construction of one Enercon E138 Wind Turbine on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m •Installation of the hardstanding area for the Wind Turbine. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c.282m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m2 and c.5m in height; •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine will be 4.2 megawatts (MW). The proposed Project will have a 30-year lifespan. A Natura Impact Statement has been prepared as part of this planning application at
Permission for development relating to the: •The construction of one Enercon E138 Wind Turbine on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Turbine. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c.282m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m2 and c.5m in height; •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance The power rating associated with the proposed wind turbine will be 4.2 megawatts (MW). The proposed Project will have a 30-year lifespan. A Natura Impact Statement has been prepared as part of this planning application at
permission to erect a dwelling house and domestic garage and install a septic tank system and percolation area and all associated site works at
Permission for: The construction of one 4.2 MW wind turbine with overall tip height of up to 150m; The construction of the wind turbine foundation, hard standing and assembly area; Provision of a site entrance and an access track within the site; Construction of an on-site 20kV substation and underground electrical cable; All associated site development and ancillary works (a Natura Impact Statement (NIS) has been submitted in respect of this application at the request of the Planning Authority) at