ObjectRight
Back to search
2660339Awaiting decisionpermission

Raheen, Clara, Co. Offaly

Not open for objections: The council has marked this application invalid or closed.

Proposed development

Construction of a new dwelling, garage, new wastewater treatment system and polishing filter all associated site works

Applicant
Not published
Authority
Offaly County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    29 Jun 2026

  2. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The council has marked this application invalid or closed.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Similar applications refused nearby

Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.

Planning history within 750 m

2660490Awaiting decision

• A high-bay logistics warehouse with racking and 4 associated loading docks and marshalling areas • Ancillary office area over three floors for administrative staff • Surface car parking spaces, HGV trailer parking spaces, and cycle parking spaces • All associated site works including landscaping, boundary treatment and SuDS

Carraig Mor Industrial Estate, Clara, Co. Offaly Offaly County Council Received 14 Sept 2026
2660348Awaiting decision

a new dwelling, garage, new waste water treatment system and polishing filter all associated site works

Raheen, Clara, Co. Offaly Offaly County Council Received 3 Jul 2026
2660230Awaiting decision

(RED 111) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly Offaly County Council Received 29 Apr 2026
2660212Awaiting decision

(RED III) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly Offaly County Council Received 23 Apr 2026
2660105Awaiting decision

RED III - for development at this site in the townlands of Lehinch, Kilcoursey, Kilbride, Aghamore, Raheen and Clara, near Clara, Co. Offaly. The development will consist of a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly Offaly County Council Received 4 Mar 2026
2560680Awaiting decision

a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: •The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of and overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). • The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application

Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly Offaly County Council Received 22 Dec 2025