Clonin, Rhode, Co. Offaly
Proposed development
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation comprising (i) an increase to the footprint of the substation compound by 190 square metres (m2) arising from the realignment of the existing palisade fence; (ii) the installation of electrical equipment including circuit breakers, cable sealing ends and voltage transformers; (iii) the installation of approximately 20m of 110kV underground electricity line; and, (iv) all associated ancillary site development works. This planning application is accompanied by an Appropriate Assessment Screening Report
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 24 Sept 2025
Timeline
Application received
31 Jul 2025
Decision due
24 Sept 2025
Decision: conditional
22 Sept 2025
Grant issued
5 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the provision of a 110kV AIS substation at Clonin, Coolcor, Rhode, Co. Offaly. The proposed development will extend the existing Derryiron 110kV transmission node. The proposed development includes the following: (i) EirGrid compound comprising EirGrid control building and external Air Insulated Switchgear (AIS), (ii) Independent Power Producer (IPP) compound, adjoining the north-western area of the proposed substation, comprising IPP control building, external grid transformer and AIS, and an underground electrical connection to the energy storage development permitted under planning application Ref. 2460289, (iii) underground 110kV electrical connection from the proposed substation to the existing Derryiron 110kV transmission node, including cabling in the public road (L10093-2), (iv) underground 110kV electrical connection from the proposed substation to underground transmission cable in the public road (L10093-2) consented under ABP-309491-21, (v) new vehicular access road (“spine road”) connecting to the RGEP road network, providing access to the proposed 110kV substation, revised access arrangements to the development permitted under planning application Ref. 2460289, and planning application Ref. 20238, (vi) new foul sewer line, serving the proposed 110kV substation and the development permitted under planning applications Ref. 2460289 and Ref. 20238, discharging to the existing local public network, (vii) removal of existing disused medium voltage substation and ancillary items, and (viii) all associated civil engineering and electrical engineering works, including underground electrical cables and ducting, temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing
the following: (i) EirGrid compound comprising EirGrid control building and external Air Insulated Switchgear (AIS), (ii) Independent Power Producer (IPP) compound, adjoining the north-western area of the proposed substation, comprising IPP control building, external grid transformer and AIS, and an underground electrical connection to the energy storage development permitted under planning application Ref. 2460289, (iii) underground 110kV electrical connection from the proposed substation to the existing Derryiron 110kV transmission node, including cabling in the public road (L10093-2), (iv) underground 110kV electrical connection from the proposed substation to underground transmission cable in the public road (L10093-2) consented under ABP-309491-21, (v) new vehicular access road (“spine road”) connecting to the RGEP road network, providing access to the proposed 110kV substation, revised access arrangements to the development permitted under planning application Ref. 2460289, and planning application Ref. 20238, (vi) new foul sewer line, serving the proposed 110kV substation and the development permitted under planning applications Ref. 2460289 and Ref. 20238, discharging to the existing local public network, (vii) removal of existing disused medium voltage substation and ancillary items, and (viii) all associated civil engineering and electrical engineering works, including underground electrical cables and ducting, temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing
provision of research and development equipment. The proposed development includes the following: (i) one new super capacitor container, (ii) two new two-storey modular DC containers, (iii) one new control room container, (iv) one new transformer and concrete bund, (v) one new IPP module, (vi) one new ESB MV substation module, (vii) one new PCS module, (viii) internal site access roads and connection to Rhode Green Energy Park road network, (ix) all civil engineering and electrical engineering work, including temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing
(i) one new super capacitor container, (ii) two new two-storey modular DC containers, (iii) one new control room container, (iv) one new transformer and concrete bund, (v) one new IPP module, (vi) one new ESB MV substation module, (vii) one new PCS module, (viii) internal site access roads and connection to Rhode Green Energy Park road network, (ix) all civil engineering and electrical engineering work, including temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing
PL2/20/238 FOR AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A 2.7-HECTARE SITE. THE DEVELOPMENT WILL COMPRISE: (i) AN OPEN AREA BATTERY ENERGY STORAGE SYSTEM (BESS) COMPOUND (AREA OF 3,407 SQM) CONTAINING 16 NO. BATTERY ENCLOSURES (13.716M LONG X 2.90M WIDE X 3.796M HIGH), 16 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (12.192M LONG X 2.438M WIDE X 3.396M HIGH), (ii) SYNCHRONOUS CONDENSER COMPOUND (AREA OF 4,706SQM) CONTAINING SYNCHRONOUS CONDENSER BUILDING (30.0M LONG X 18.0M WIDE X 12.15M HIGH), CONTROLS BUILDING (12.486M LONG 12.192M WIDE X 4.865M HIGH), ASSOCIATED BUNDED TRANSFORMERS AND ELECTRICAL PLANT, (iii) ELECTRICAL SUBSTATION (AREA OF 2,325SQM) CONTAINING CUSTOMER BUILDING (10.032M LONG X 7.627M WIDE X 6.169M HIGH), EIRGRID BUILDING (13.507M LONG X 12.509M WIDE X 7.577M HIGH), AND ELECTRICAL PLANT AND BUNDED TRANSFORMER WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE EXISITING DERRYION 110KV SUBSTATION LOCATED ON LANDS ADJOINING THE SITE TO THE SOUTH, (iv) CONTROL BUILDING (17.075M LONG X 5.830M WIDE X 5.960M HIGH), AND (v) ALL ANCILLARY DEVELOPMENT, INCLUDING; LIGHTING MAST PROTECTION, PERIMETER PALISADE FENCING WITH ACCESS GATE AT PRIMARY VEHICLE SITE ENTRANCE WHICH WILL CONNECT TO THE EXISTING ROADS OF THE ADJACENT RHODE BUSINESS PARK PROVIDING ACCESS TO THE R400, LANDSCAPING, LIGHTING,CAR PARKING, INTERNAL ACCESS ROADS AND ALL CIVIL ENGINEERING WORKS FOR THE DISPOSAL OF FOUL AND SURFACE WATER. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATION
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation comprising (i) an increase to the footprint of the substation compound by 190 square metres (m2) arising from the realignment of the existing palisade fence; (ii) the installation of electrical equipment including circuit breakers, cable sealing ends and voltage transformers; (iii) approximately 20m of 110kV underground electricity line; and, (iv) all associated ancillary site development works. This planning application is accompanied by an Appropriate Assessment Screening Report.