Lumcloon, Cloghan, County Offaly
Proposed development
An extension to the existing Derrycarney 110kV Substation. The proposed development includes the construction of the following: (i) two new independent power provider (IPP) buildings, (ii) two new electrical transformers, (iii) additional air insulated switchgear (AIS) including four new 110kV bays, (v) connection to the grid via the existing 110kV Derrycarney substation, (vi) access to the site is proposed through an upgraded existing entrance onto the R357 regional road consented under planning reference 23/60111 and through the existing Derrycarney 110kV Substation entrance, (vii) all civil engineering works, drainage, internal roads, landscaping, lighting, temporary construction compound and security fencing
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- Not available
Timeline
Application received
25 Nov 2024
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The proposed development includes the construction of the following: (i) two new independent power provider (IPP) buildings, (ii) two new electrical transformers, (iii) additional air insulated switchgear (AIS) including four new 110kV bays, (v) connection to the grid via the existing 110kV Derrycarney substation, (vi) access to the site is proposed through an upgraded existing entrance onto the R357 regional road consented under planning reference 23/60111 and through the existing Derrycarney 110kV Substation entrance, (vii) all civil engineering works, drainage, internal roads, landscaping, lighting, temporary construction compound and security fencing.
The proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The proposed development will utilise the existing customer (IPP) building and electrical infrastructure to connect to the grid via the 110kV Derrycarney transmission substation, which adjoins the BESS facility, (ii) Access to the site is proposed through an upgraded existing entrance onto the R357 regional road, (iii) All civil engineering works, drainage, internal roads, landscaping, lighting and security fencing.
an extension to the existing battery energy storage system (BESS) facility (consented under Planning Ref 19/55) the proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The proposed development will utilise the existing customer (IPP) building and electrical infrastructure to connect to the grid via the 110kV Derrycarney transmission substation, which adjoins the BESS facility, (ii) Access to the site is proposed through an upgraded existing entrance onto the R357 regional road, (iii) All civil engineering works, drainage, internal roads, landscaping, lighting and security fencing.
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high; a proposed 5.00m wide graded track between an existing site entrance and BESS; internal access tracks; widening of 2no. existing field entrances and all associated development. Two temporary compounds, measuring 5250sqm approx. in overall area, will be established during the construction phase of the solar farm. The planning permission will have a duration of 10-years, with a subsequent operational lifetime of 40- years, after which it will be decommissioned with all associated lands returned to their original use excluding the Silver River bridge crossing, which shall be retained. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application.
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high; a proposed 5.00m wide graded track between an existing site entrance and BESS; internal access tracks; widening of 2no. existing field entrances and all associated development. Two temporary compounds, measuring 5250sqm approx. in overall area, will be established during the construction phase of the solar farm. The planning permission will have a duration of 10-years, with a subsequent operational lifetime of 40- years, after which it will be decommissioned with all associated lands returned to their original use excluding the Silver River bridge crossing, which shall be retained. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application.
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high; a proposed 5.00m wide graded track between an existing site entrance and BESS; internal access tracks; widening of 2no. existing field entrances and all associated development. Two temporary compounds, measuring 5250sqm approx. in overall area, will be established during the construction phase of the solar farm. The planning permission will have a duration of 10-years, with a subsequent operational lifetime of 40- years, after which it will be decommissioned with all associated lands returned to their original use excluding the Silver River bridge crossing, which shall be retained. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application.