BALLYLIN, FERBANE, CO. OFFALY
Proposed development
CONSTRUCTION OF A NEW FOUR BEDROOM DWELLING. THE APPLICATION WILL ALSO INCLUDE A DOMESTIC GARAGE, NEW TREATMENT UNIT AND PERCOLATION AREA, NEW ENTRANCE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 5 Apr 2021
- Residential units
- 1
- Floor area
- 332 m²
Timeline
Application received
3 Dec 2020
Council asked for further information
4 Feb 2021
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
9 Mar 2021
Decision due
5 Apr 2021
Decision: conditional
1 Apr 2021
Grant issued
6 May 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
dwelling house, domestic garage, effluent treatment, and all ancillary works
Dwelling house, domestic garage, effluent treatment, and all ancillary works
the development of a recreational shared cycle and walkway located on Bord Na Móna lands within the townlands of Cloncraff or Bloomhill, Clonascra, Ballyduff, Clonaderg, Doon Demesne, Lackagh Beg, Lackagh More, Cormore and Corbeg, Corbane, Ballydaly, Kilcolgan Beg, Turraun, Leabeg, Leamore, Oughter, Derrymore, Bunakeeran, Lumcloon and Broughal in County Offaly. The development proposes the following; a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 16,919 meters of existing former rail bed and 8,960 meters along existing bog headlands / former high fields. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Greenway, The Offaly Way, and the Lough Boora Discovery Park. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 5 no. Type 2 Gateways (including 2 no. upgrades to existing parking and 3 no. proposed parking facilities) ii. 6 no. Type 3 Gateways iii. 1 no. Type 4 Gateways iv. 2 no. Major Rest Points v. 2 no. Minor Rest Points d) Upgrade works to Brosna Bridge (Ref 15-100). e) The construction of a new pedestrian and cycle bridge spanning the Grand Canal within the Turraun townland. f) Upgrade works to 10 no. local access road crossings, and 8 no. agricultural crossings. g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for health and safety and biodiversity reasons which will include 14,909 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS)
he development of a recreational shared cycle and walkway. The development proposes the following; The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 16,919 meters of existing former rail bed and 8,960 meters along existing bog headlands / former high fields. The proposed shared cycle and walkway will connect into the existing Grand Canal Greenway, The Offaly Way, and the Lough Boora Discovery Park. The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; 5 no. Type 2 Gateways (including 2 no. upgrades to existing parking and 3 no. proposed parking facilities) 6 no. Type 3 Gateways, 1 no. Type 4 Gateways, 2 no. Major Rest Points, 2 no. Minor Rest Points. Upgrade works to Brosna Bridge (Ref 15-100). The construction of a new pedestrian and cycle bridge spanning the Grand Canal within the Turraun townland. Upgrade works to 10 no. local access road crossings, and 8 no. agricultural crossings. The erection of wayfinding and interpretative signage at Gateway locations along the route. The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. Fencing and screening will be erected where required for health and safety and biodiversity reasons which will include 14,909 meters of ecological screening. All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS)
the existing apartments in the existing basement of the dwelling house. Permission is also sought to retain and complete for the existing outbuilding to the south boundary of the site and all associated site works
The demolition of existing extensions to an existing dwelling which is a protected structure (RPS No.: 21-01 & NIAH Ref.: 14914005); proposed internal and external alterations and the construction of new extensions to the side and rear of the same dwelling; and all ancillary site development works