DERRYMORE, CLONBULLOGUE, CO. OFFALY
Proposed development
(A) NEW DETACHED BUNGALOW DWELLING HOUSE, (B) NEW RECESSED SITE ENTRANCE, (C) NEW ON-SITE DOMESTIC WASTEWATER TREATMENT SYSTEM, (D) LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 24 Feb 2021
- Residential units
- 1
- Floor area
- 163 m²
Timeline
Application received
15 Jul 2020
Council asked for further information
7 Sept 2020
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
28 Jan 2021
Decision due
24 Feb 2021
Decision: conditional
22 Feb 2021
Grant issued
7 Apr 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
PL2/20/296 FOR (A) NEW DETACHED BUNGALOW DWELLING HOUSE, (B) NEW RECESSED SITE ENTRANCE, (C) NEW ON-SITE DOMESTIC WASTEWATER TREATMENT SYSTEM, (D) LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
EirGrid plc, with the consent and approval of the Electricity Supply Board (ESB) is applying to Offaly County Council for permission for works associated with the proposed uprate of the existing 110 kV Overhead Line (OHL) between the existing Cushaling 110 kV substation in the townland of Ballykilleen, Co. Offaly and the existing Portlaoise 110 kV substation in the townlands of Clonminam and Kylekiproe, Co. Laois. The Proposed Development works across the functional area of Co.Offaly will comprise: Replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor including installation of a new fibre communication connection; replacement of the existing earthwire with new earthwire between structures 1 and 8; replacement of steel members at 3 no. towers; Full tower painting required at 3 no. locations; replacement of wooden poles only at 7 no. locations; replacement of wooden poles and crossarm at 2 no. locations; replacement of crossarm only at 3 no. locations; replacement of existing danger notices at various locations, as required; replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware and anti-climbing guards at various locations, as required; replacement of suspension clamps, vibration dampers & compression assemblies at all locations, as required; All associated temporary site development works to gain access to the existing structures & other temporary associated & ancillary development works required for the purpose of the uprate of the existing circuit. No additional structures are proposed along the existing circuit. Structure 203 will be relocated approx. 101m back towards structure 202 due to its existing position on top of a gravel mound & the potential for subsidence of gravel in the long term. No alteration to the nature, extent, alignment, character or voltage of existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) has been submitted with this application. Full description of all works within Site Notice.
CONSTRUCTION OF A NEW DORMER STYLE BUNGALOW, SITE ENTRANCE, INSTALLATION OF PROPRIETARY TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS