Drumcoofoster, Scotstown, Co. Monaghan
Proposed development
Permission for development of a single storey extension to the side of the existing dwelling and all associated site works.
- Applicant
- Not published
- Authority
- Monaghan County Council
- Decision due
- 23 Apr 2019
- Residential units
- 1
- Floor area
- 21 m²
Timeline
Application received
27 Feb 2019
Decision due
23 Apr 2019
Decision: conditional
8 Apr 2019
Grant issued
13 May 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
permission to construct 1 no. poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and site works (including upgraded site entrance) associated with the above development
permission to construct a domestic garage to the side of dwelling house and all associated site works
permission consisting of adjustment to boundaries of site and position of filter unit and percolation area to that granted permission in planning ref 20/411 and exit on to public road by way of existing entrance
Permission to demolish existing un-habitable dwelling and to erect fully serviced storey and a half type dwelling with detached domestic garage, reinstate and upgrade existing entrance connection to services, installation of proprietary treatment system and all ancillary works.
permission to construct 1 no. poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s) and site works (including new/upgraded site entrance) associated with the above development. An Environmental Impact Assessment Report (E.I.A.R.) and Natura Impact Statement (N.I.S.) will be submitted with this planning application.
permission to construct 1 no. poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and site works (including upgraded site entrance) associated with the above development