Ardcath, Garristown, County Meath
Proposed development
A) Demolition of the existing sub-standard, G-BER rated, detached and derelict 1 and 2-storey dwelling. b) The construction of a replacement A-BER rated, detached, 1 and 2-storey dwelling and garage, with the dwelling offset by 2m from the existing dwelling’s roadside building line, within the same site. c) The continued use of the two existing vehicular entrances. d) An EPA compliant Waste Water Treatment System to replace the existing septic tank system. e) All associated site-works
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- Not available
Timeline
Application received
26 Jun 2026
Last day for public submissions (est.)
Thu 30 Jul 2026
Council asked for further information
20 Aug 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Planning permission for installation of new waste water treatment system and percolation area, decommissioning of existing septic tank and associated site works. Retention permission for single storey extensions to side and rear of existing single storey dwelling and as-built alterations to original Planning Permission granted (Ref: 70/286).
the development consists of construction of a part two storey, part single storey detached dwelling, detached single storey domestic garage, new vehicular entrance onto public roadway, driveway, waste water treatment system, percolation area, landscaping and associated site works. Significant further information/revised plans submitted on this application
EXTENSION OF DURATION OF PLANNING PERMISSION AA/191516 - Re-contouring of agricultural land and associated site works using imported clean inert soil and stones within a farm holding of 2.626 hectares (plus the additional access roadway of 0.211 hectares) for the consequent6ial benefit to agriculture. A 2 year planning permission is requested, and during this period 24,773 tonnes of inert soil and stones will be imported for the purposes of land reclamation
the construction of a new dwelling house, a new waste water treatment plant and percolation area including all associated site works and new site entrance
a storey and a half style dwelling, advanced waste water treatment system and percolation area, new entrance walls and piers and all ancillary site development works
construction of a detached single storey dwelling with habitable attic accommodation, a detached single storey storage shed, new site entrance, proprietary waste water treatment system & all associated works