Gallow, Summerhill, Co. Meath
Proposed development
The development will consist of the demolition of existing single storey entrance porch to the north-west side and first floor dormer to the south-east side of the existing dwelling, the construction of a new storey and a half style extension to the south-east side of the existing dwelling, renovations & alterations to the existing dwelling with all associated elevational changes, the decommissioning of the existing septic tank and the installation of a new waste water treatment system and all associated site works.
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 11 Jul 2026
Timeline
Application received
17 May 2026
Decision due
11 Jul 2026
Decision: conditional
9 Jul 2026
Grant issued
24 Aug 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
File Ref: 211625 - the development will consist of one and a half storey dwelling, detached domestic garage, installation of new proprietary waste water treatment system and polishing filter together. The development also includes new dual entrance with proposed dwelling to the west of the site, driveway and all associated site works
permission is being sought to construct a new 2 storey dwelling with wastewater treatment system and percolation area, domestic garage with new domestic vehicular entrance and all associated site works
The development will consist of change of house type from that previously granted permission under planning reference no. 21/1624 to single storey dwelling. The development also includes revised location of proposed domestic garage on site together with all associated site works.
File Ref TA191670 - the construction of part two storey, part single storey detached dwelling house, with first floor terrace to the rear, Detached garage, new vehicular entrance gateway, new access road, new waste water treatment unit and polishing filter, along with all associated services, service connections, landscape and site development works
the development consists of (i), the renovation of an existing derelict cottage, (ii) a single storey extension to the Northwest side of the existing cottage, (iii) a new on-site wastewater treatment system, (iv) a new well, (v) upgrade the existing entrance, and ancillary works
for the change of use of existing garage (25m2) into a habitable space ancillary to existing dwelling to also include extension of existing dwelling to join together as one dwelling. This is to include all ancillary site works, and associated services.