Killeen, Dunsany, Co. Meath
Proposed development
The development consists of retention permission for changes made during the construction to approved planning application Reference Number 21/1285 Namely minor alteration to overall house size, changes to roof pitch and first floor layout, rooflight and revised house location and site boundaries
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 4 Jun 2026
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
10 Apr 2026
Decision due
4 Jun 2026
Decision: conditional
4 Jun 2026
Grant issued
14 Jul 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of an agricultural shed for cattle, hay and straw storage with underground slurry storage and a soiled water tank
Permission and Retention Permission for Development comprising of retention and completion of amendments to design of 1no. permitted 2 storey 5-bedroom detached house & garage and associated site development & landscape works, with a site area of 0.24ha, being part of a previously permitted residential development of 22 houses at Loughmore Walk/The Burrows (ref ra/191174). The proposal to include minor alterations to elevations, revised fenestration to rear, new rooflights to rear, new ground floor bay window to side, new & revised gable windows, internal layout alterations, and external escape staircase from basement. The vehicular access is as previously permitted via the existing internal roads & entrances to Killeen Castle Demesne. all within the overall site of approx. 255 ha (a protected structure)
the development consists of the change of use from existing stable block to dwelling house incorporatng a new roof and changes to the existing elevations including all associated site works and new drainage connection
an attic conversion with dormer style windows to the back of the existing extended detached house. The development will consist of a new office, gym and utility areas with new windows to the rear of the property and a new roof ridge level
the development consists of the change of use from existing stable block to dwelling house incorporating a new roof and changes to the existing elevations including all associated site works and new drainage connection
a part two storey, part single storey dwelling house, detached storey and a half garage with home office and gym, connection to the existing Dunshaughlin sewerage scheme, new vehicular access road and entrance gateway to the existing lane, along with all associated services, service connections, landscape and site development works. Significant further information/revised plans submitted on this application