Block 4. Units 3589 & 10, Ashbourne Business Park, Ashbourne Co. Meath
Proposed development
The items for which Retention Permission is sought are as follows: 1. The removal of internal party walls and the removal of numerous original ancillary offices and WCs of adjoined units 3,5,8,9 &10 and reconfiguration of ancillary office & staff facilities located at Unit 3, resulting in: A. At Ground Floor Plan: Retention of Change of Use of 77m2 of Ancillary Offices and Staff Facilities Area to Warehouse due to the above alterations, resulting in 883m2 of Warehouse Area & 79m2 of Ancillary Office & Staff Facilities. B. At First Floor Plan: Retention of Addition of 69m2 of Ancillary Office & Staff Facilities due to the above alterations. 2. Associated elevational adjustments including the removal of an unrequired pre-existing exit door to unit 9, and the replacement of pre-existing exit doors to units 5,8,10 and 3 with fire exit doors. All external elements such as carparking, drainage, site access and landscaping remain unaltered as a result of these building layout adjustments
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- Not available
Timeline
Application received
31 Mar 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development will consist of the construction of a 2 storey office building with ancillary facilities, new vehicular and pedestrian access off permitted road (under ref No: AA190412) currently under construction, car parking and all associated site development works including drainage infrastructure, site boundaries, SUDS features and Landscaping
the development, which will represent an extension to the existing Primeline Logistics campus at Ashbourne Business Park, will comprise the construction of 1 No. warehouse (Unit 12G) with ancillary offices and staff facilities, with a maximum height of 15.95 metres with a gross floor area of 13,869 sq m comprising warehouse area (13,184sq m), ancillary office area (232 sq m) and staff facilities (453 sq m). The development will also include: provision of HGV access/egress, HGV yard with 8 No. HGV parking spaces; independent car parking access/egress with 75 No. car parking spaces, covered bicycle parking; smoking shelter; gates; dock levellers; signage; public lighting; sprinkler tank; pump house; noise barrier; boundary treatments; hard and soft landscaping; and all associated site development works above and below ground
the development, which will represent an extension to the existing Primeline Logistics campus at Ashbourne Business Park, will comprise the construction of 1 No. warehouse (Unit 12G) with ancillary offices and staff facilities, with a maximum height of 15.95 metres with a gross floor area of 13,869 sq m comprising warehouse area (13,184sq m), ancillary office area (232 sq m) and staff facilities (453 sq m). The development will also include: provision of HGV access/egress, HGV yard with 8 No. HGV parking spaces; independent car parking access/egress with 75 No. car parking spaces, covered bicycle parking; smoking shelter; gates; dock levellers; signage; public lighting; sprinkler tank; pump house; noise barrier; boundary treatments; hard and soft landscaping; and all associated site development works above and below ground
the development will consist of a 2-storey extension to the side and front of the existing ballroom and ground-floor pre-function areas of the existing premises, to provide additional sanitary and storage facilities, as well as an altered entrance and all associated site works
The development will consist of the construction of 3 no. external padel courts with an associated canopy enclosure, a single-storey structure containing a sauna facility and changing facilities with ancillary storage. The development also includes a bin store, 5 no. car parking spaces, boundary treatments including fencing, hard and soft landscaping, internally illuminated signage, and all associated site development works.
the construction of a first floor extension above existing side and rear ground floor structure, to include new stairwell window to side of house, also all associated site works