Gortloney, Dromone Oldcastle, CO. MEATH
Proposed development
The development consists of the following: Retention permission (1) 5-year Retention period for excavated and hardcore area and placement of 1000 m3 Citerneo slurry storage bag and (2) general landscaping and ancillary site works. Planning permission for: (1) to construct new carpark area and ancillary works (2) construct new entrance drive (3) widen existing public road (4) construct access walls and piers, fencing and gates (5) general landscaping and ancillary site works
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- Not available
Timeline
Application received
6 Feb 2026
Last day for public submissions (est.)
Thu 12 Mar 2026
Council asked for further information
30 Mar 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
3 Sept 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development for Retention consists of: Retention for revisions to layouts of dwelling and detached domestic garage, revisions to site boundaries, vehicular entrance, agricultural entrance and agricultural access lane all as granted permission under KA60176. The development for Permission will consist of: Proposed construction of stables, dungstead, effluent tank, and all ancillary site works
retention permission to retain an existing site entrance in its current location and to keep the orientation of the current dwelling and permission for an extension to the existing dwelling and all associated site works. Significant Further Information/Revised Plans submitted on this application
the restoration of an historic sand and gravel quarry back to its original ground levels, for use solely for agricultural purposes. The development will involve (i) the importation of 163,540 Tonnes of imported inert natural materials, soil and stones, (ii) re-instatement of existing overburden contained on site (iii) the remediated lands will be covered with 300mm of topsoil and reseeded with grass when complete and (iv) relocation/upgrading of the existing entrance for improved access, installation of temporary (portacabin type site office/staff welfare facility, 1 no. portable toilet, portable wheel wash facility, Paladin security fencing with sliding gate at boundary with public road, and internal haul road to access quarry) for a period not exceeding 3 years together with all associated site works. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). Significant further information/revised plans submitted on this application
the restoration of an historic sand and gravel quarry back to its original ground levels, for use solely for agricultural purposes. The development will involve (i) the importation of 163,540 Tonnes of imported inert natural materials, soil and stones, (ii) re instatement of existing overburden contained on site (iii) the remediated lands will be covered with 300mm of topsoil and reseeded with grass when complete and (iv) relocation/upgrading of the existing entrance for improved access, installation of temporary (portacabin type site office/staff welfare facility, 1 no. portable toilet, portable wheel wash facility, Paladin security fencing with sliding gate at boundary with public road, and internal haul road to access quarry) for a period not exceeding 3 years together with all associated site works. The planning application is accompanied by an Environmental Impact Assessment Report. This application relates to a restoration development for the purposes of an activity which may require a waste facility permit to be issued by Meath County Council or which may source restorative material as by-product under an Article 27 declaration from the producer of such materials.
permission is sought to (1) demolish existing single storey detached structure (water store) "A" (2) dismantle and relocate existing single storey detached maintenance shed "B" to location "X" within site boundary (3) construct two storey maintenance and plant room shed "C" (4) construct revised single storey freezer and chillroom shed "D" from that previously granted under planning ref. KA181253 (5) construct two storey extension "E" to existing front elevation to incorporate dry ageing chill area and plant room (6) construct single storey rear extension "F" incorporating lorry loading area (7) relocate overground storage tank "G" from that previously granted under planning ref KA181253 to location "Y" within site boundary (8) erect over ground water storage tank "H" (9) construct 2 no. underground storage tanks "I" (10) construct single storey extension "J" incorporating lobby area to front levation (11) erect revised entrance gate "K" from that previously granted under planning ref KA181253 (12) carry out amendments and alterations to floor plans and elevations from that previously granted under planning ref KA181252 (13) complete all ancillary and facilitating site works. Significant further information/revised plans submitted on this application
to construct a 27.77 sq.m single storeyed Sun Room extension to the northern end of their dwelling house at Gortloney, Dromone, Co. Meath with all necessary associated site works.