St. Anthony's, Boyne Road, Ferganstown and Ballymacon Navan Co Meath
Proposed development
The development will consist of the retention of alterations and change of use of existing detched domestic garage for use as a granny flat and all ancillaries
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- Not available
Timeline
Application received
11 Sept 2026
Last day for public submissions (est.)
Thu 15 Oct 2026
Council asked for further information
4 Nov 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of the construction of an estate road and access roads extending northwards from the section of road permitted under Meath County Council Reg. Ref. 22/1703 and ACP Ref. 318533-23 (currently under construction), connecting to Roundabout 3 of Local Distributor Road 6 (LDR6), to facilitate access to the Boyne Village Enterprise Lands. The development includes drainage and utility services infrastructure, landscaping, pedestrian and cycle facilities, road signs and markings, public lighting, modifications and enlargement (reduce base level by c. 200mm) and widening of the attenuation pond located within the south-eastern corner of the site, and all associated and ancillary site development works. A Natura Impact Statement will be submitted to the planning authority with the application
• The construction of a two-storey (building height of c. 15.5m above ground level) industrial laundry processing and distribution facility warehouse (with a gross floor area (GFA) of c.10,514 sq.m), including: a ground floor warehouse and processing area of c.9,000 sq.m; a mezzanine level of c. 1,514 sq.m (including ancillary offices, storage, and staff amenities) with backlit signage extending to 22.5 sqm on the eastern elevation; • Vehicular access to the site will be via roundabout 3 at the Local Distributor Road 6 and the existing and permitted estate roads at Boyne Village Business Park estate roads; • Parking and loading facilities including: 107 staff car parking spaces (102 standard, 5 accessible) with 1 set-down space, 30 bicycle parking spaces, 19 truck parking spaces and 20 van parking spaces, 10 truck loading bays and 12 van loading bays; • Ancillary structures and services including single storey ESB substation (c. 22 sq.m), sprinkler system pump room (c. 40 sq.m), sprinkler attenuation tank, external water tank, external CO2 tanks and gas skid; • Site boundary works, landscaping, roads and drainage infrastructure (including foul and surface water drainage and attenuation measures and extension of estate road) as well as all other ancillary and associated development works. A Natura Impact Statement will be submitted to the planning authority with the application. Significant further information/revised plans submitted on this application
10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of covers to existing primary settlement tanks; upgrade of ventilation system and installation of odour control unit; provision of a containerised standby generator; construction of below ground storm attenuation tank; decommissioning of redundant sludge digestor tanks and related equipment; site access upgrades, and all ancillary landscaping and site development works above and below ground An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with this application
the development will consist of single storey extensions to rear & side of detached two storey house, & all ancillary site works
the development will consist of a new wastewater pumping station that discharges to the inlet pipework of the Navan WWTP via two new rising main sewerage pipes. The pumping station development also includes an underground 924m3 emergency storage tank with a further 427m3 provided within the pumping station inlet chamber, wet wells and upstream sewerage network. The pumping station compound includes underground valve, inlet, wet well and flow meter chambers; and above ground structures including a control panel kiosk, operator welfare unit kiosk, wet kiosk, ESB substation, surge vessels with stair access, overhead gantry crane; and other tanks, plant and equipment. The compound also contains set down space for an emergency electrical generator, site lighting and hard surfaced internal circulation space and will be enclosed by 2.4m high security fencing with vehicle access gates. The compound will be accessed by a fenced and gated temporary road from the LDR6 distributor road. Other water and sewerage infrastructure will include the provision of a gravity sewer and a watermain from the roundabout on the LDR6 distributor road to the proposed pumping station. The proposed development also includes for a trenchless crossing under the Navan to Drogheda rail line, all landscaping and reinstatement works and ancillary site development works. A Natura Impact Statement is included with the planning application. Significant further information/revised plans submitted on this application
the development consists of a retention planning permission for a domestic garage and all associates site works