the east & south of the existing Hub Logistics Park, Gunnocks Portmanna & Clonee, Co. Meath
Proposed development
The proposed development consists of a logistics, warehouse and/or light industrial development comprising of 5 no. buildings with overall gross floor area of approximately 50,473 sq.m, as follows: • 3 no. Warehouse/ Logistics/ Light Industrial Units (units A04, A05 and A06), with a combined gross floor area of approximately 39,365 sq.m located to the north of the proposed central (east-west) access road. Each building has a gross floor area of 13,121.8 sq.m, comprising of 12,220 sq.m of Warehouse/ Logistics/ Light Industrial floorspace at ground floor level together with ancillary office floorspace (109 sq.m); ancillary canteen (42 sq.m); associated reception (33 sq.m) and associated staff welfare facilities; toilets; changing rooms; and plant and storage rooms at ground floor level. At first floor level provision is made for a further 163 sq.m ancillary office floorspace and canteen (173 sq.m) together with staff welfare facilities and toilets. The proposed buildings have a maximum building height of approximately 16.8m above ground level. Each of the three units will include 845 sq.m of solar panels fixed to a portion of the building roof. The buildings are set back from the northern edge of the access road to provide for landscaped forecourt parking areas to the front of each unit that are accessed of the proposed internal distributor road to provide ancillary car parking (47 no. spaces (including 2 no. disabled spaces) to serve Unit A04; 45 no. spaces (including 2 no. disabled spaces) to serve Unit A05; and 41 no. spaces (including 2 no. disabled spaces) to serve Unit A06), and set down areas to the front of each building, respectively, together with covered bicycle storerooms (each providing 6 no. spaces) and an ESB sub-station (21.1 sq.m) for each building. A separate service access road is provided off the central (east-west) access road leading to the rear of each building from where it will be serviced. Provision is made for HGV parking and loading facilities together with circulation space within the service yards that are enclosed / fenced with 1.8m high palisade fencing, with an automatically opening gate to provide access. …….
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 2 Mar 2026
Timeline
Application received
14 May 2025
Council asked for further information
7 Jul 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
6 Jan 2026
Decision due
2 Mar 2026
Decision: conditional
27 Feb 2026
Grant issued
16 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development consists of Permission for Retention of 2 X extensions to the side and rear of existing dwelling house with external alterations to all elevations and amended internal alterations and permission to construct a detached domestic garage to the side of the existing dwelling house and all associated site development works
the development will consist of 2 no. new external backlit signs at high level to be mounted on the West and South elevation of the existing warehouse building. An additional 2 no. directional signs at ground level to be installed to indicate vehicular routes
the development will consist of 2 no. new external backlit signs at high level to be mounted on the West and South elevation of the existing warehouse building. An additional 2 no. directional signs at ground level to be installed to indicate vehicular routes
the development will consist of (a) proposed 1.2m2 signage on the Southeast Elevation, and (b) proposed 2m2 signage on the Northwest Elevation of the existing building Unit 16
the development will consists of (a) the proposed change of use of 305m2 of the existing product display area and spares storage area on the ground floor to proposed office use including associated canteen; (b) the change of use of 242m2 of the existing ancillary storage area on the first floor to proposed office, training, innovation and product display areas, and (c) new external 1m high x 4.4m wide signage on the Northwest & Southeast Elevations
the development will consists of (a) the proposed change of use of 305m2 of the existing product display area and spares storage area on the ground floor to proposed office floor to proposed office use including associated canteen; (b) the change of use of 242m2 of the existing ancillary storage area on the first floor to proposed office, training, innovation and product display areas, and (c) new external 1m high x 4.4m wide signage on the Northwest & Southeast Elevations