Part of site D, Ashbourne Business Park, Ashbourne Co Meath
Proposed development
The development will consist of: (i) the construction of 1 no. single-storey high-tech manufacturing facility (overall height 10.115m), incorporating a two-storey element at ground and first floor to accommodate offices, staff facilities, and a plant room, with a total gross floor area of 1,996 sq. m; (ii) 26 no. standard car parking spaces, 2 no. wheelchair accessible parking spaces, and 16 no. bicycle spaces; (iii) 1 no. ESB substation and 1 no. bin store; (iv) all associated ancillary site works including goods yard, driveway, landscaping, boundary treatments, water main and drainage works, all on the site of circa 0.412 hectares. Significant further information/revised plans submitted on this application
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 13 Sept 2026
Timeline
Application received
23 Oct 2025
Council asked for further information
17 Dec 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
17 Aug 2026
Decision due
13 Sept 2026
Decision: conditional
11 Sept 2026
Grant issued
27 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development will consist of the construction of a 2 storey office building with ancillary facilities, new vehicular and pedestrian access off permitted road (under ref No: AA190412) currently under construction, car parking and all associated site development works including drainage infrastructure, site boundaries, SUDS features and Landscaping
the development, which will represent an extension to the existing Primeline Logistics campus at Ashbourne Business Park, will comprise the construction of 1 No. warehouse (Unit 12G) with ancillary offices and staff facilities, with a maximum height of 15.95 metres with a gross floor area of 13,869 sq m comprising warehouse area (13,184sq m), ancillary office area (232 sq m) and staff facilities (453 sq m). The development will also include: provision of HGV access/egress, HGV yard with 8 No. HGV parking spaces; independent car parking access/egress with 75 No. car parking spaces, covered bicycle parking; smoking shelter; gates; dock levellers; signage; public lighting; sprinkler tank; pump house; noise barrier; boundary treatments; hard and soft landscaping; and all associated site development works above and below ground
the development, which will represent an extension to the existing Primeline Logistics campus at Ashbourne Business Park, will comprise the construction of 1 No. warehouse (Unit 12G) with ancillary offices and staff facilities, with a maximum height of 15.95 metres with a gross floor area of 13,869 sq m comprising warehouse area (13,184sq m), ancillary office area (232 sq m) and staff facilities (453 sq m). The development will also include: provision of HGV access/egress, HGV yard with 8 No. HGV parking spaces; independent car parking access/egress with 75 No. car parking spaces, covered bicycle parking; smoking shelter; gates; dock levellers; signage; public lighting; sprinkler tank; pump house; noise barrier; boundary treatments; hard and soft landscaping; and all associated site development works above and below ground
the development will consist of a 2-storey extension to the side and front of the existing ballroom and ground-floor pre-function areas of the existing premises, to provide additional sanitary and storage facilities, as well as an altered entrance and all associated site works
The development will consist of the construction of 3 no. external padel courts with an associated canopy enclosure, a single-storey structure containing a sauna facility and changing facilities with ancillary storage. The development also includes a bin store, 5 no. car parking spaces, boundary treatments including fencing, hard and soft landscaping, internally illuminated signage, and all associated site development works.
the construction of a first floor extension above existing side and rear ground floor structure, to include new stairwell window to side of house, also all associated site works