Balgeeth, Ardcath Garristown, Co. Meath
Proposed development
The development will consist of a redesigned and repositioned two-storey dwelling and associated garage, a repositioned vehicular entrance, a redefined site boundary and slightly repositioned wastewater treatment system and percolation area from that approved under application 212017. All other aspects of the development to remain as previously approved
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 24 Jan 2026
- Residential units
- 1
- Floor area
- 257.6 m²
Timeline
Application received
27 Sept 2025
Council asked for further information
20 Nov 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
19 Dec 2025
Decision due
24 Jan 2026
Decision: conditional
19 Jan 2026
Grant issued
4 Mar 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development will consist of single storey extension to rear of existing dwelling, modifications to existing elevations and internal plan layout, new domestic entrance and driveway. The development also includes the installation of a proprietary waste water treatment system and polishing filter, pedestrian entrance off existing farm entrance together with all associated site works
A) demolition of existing old dairy shed B) construction of a livestock shed to include cubicles, straw bedded area, feed area with underground slatted slurry storage tank C) construction of a calf rearing shed with extended storage area and all associated site works
Dwelling house, detached domestic garage, waste water treatment system and percolation area, new vehcular entrance from public road and all associated site works. Significant further information/revised plans submitted on this application
The development will consist of the construction of a single storey dwelling, wastewater treatment system with polishing filter, new entrance, revised site boundaries and all ancillary site works
the development will consist of the retention of a domestic garage with revised site boundaries and all ancillary site works
side extension to dwelling house and all associated site works