Forde de Fyne, Naul, Co Meath
Proposed development
The retention of an agricultural shed in an existing farm yard
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 16 Oct 2025
Timeline
Application received
7 Mar 2025
Council asked for further information
30 Apr 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
19 Sept 2025
Decision due
16 Oct 2025
Decision: conditional
13 Oct 2025
Grant issued
28 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
File Ref: 21488 - proposed two storey dwelling house, domestic garage, wastewater treatment system and polishing filter, alteration of existing entrance from public roadway and formation of new entrance into site, and all associated site works
proposed two storey dwelling house, domestic garage, wastewater treatment system and polishing filter, alteration of existing entrance from public roadway and formation of new entrance into site, and all associated site works. Significant Further information /Revised plans submitted on this application
proposed storey and a half type dwelling house, domestic garage, wastewater treatment system and polishing filter, new entrance into site (accessible from existing public roadway entrance) and all associated site works
PLANNING PERMISSION AA151307 - development will consist of the removal of an existing cottage and the construction of a two storey four bedroom dwellinghouse with attached garage and proprietary waste water treatment system with percolation area. This permission shall cease to have effect on the 23rd May 2026.
proposed storey and a half type dwelling house, domestic garage, wastewater treatment system and polishing filter, new entrance into site (accessible from existing public roadway entrance) and all associated site works
the development will consist of (i) the demolition of existing boiler structure, utility room and storage, (ii) construction of an extension to the house to serve as a family flat containing a bedroom, toilet, kitchen and living room at ground floor, (iii) construction of additional first floor storage area and dormer window to existing house, (iv) construction of a new utility room to existing house and (v) removal of the existing hedge line