Site of the Former Brews Hill Filling Station and Former Irish National Foresters Hall, Brews Hill, Navan
Proposed development
EXTENSION OF DURATION OF PLANNING PERMISSION NA190965 - Refer to Addendum - the construction of an apartment and commercial scheme within two blocks with surface and basement car parking. Block A (front block) comprises a 3 storey building with a setback 3rd storey comprising of 2 no. ground floor retail/office units (346sq.m) with 11 apartment units in total (1no. 3 bed, 3 no. 2 bed and 7 no. of 1 bed units on the upper two floors). Block B (rear block) comprises a 5 storey building with a setback 5th storey comprising of 32 apartment units in total (15 no. of 2 bed and 17 no. of 1 bed units) and terraced roof garden. There are 43 apartment units in total (1x 3 Bed + 18 x 2 Bed + 24 x 1 Bed) with associated private amenity spaces with 52 car parking spaces in total (21 surface car spaces and 31 basement car spaces), cycle-parking facilities, secure bin storage facility and communal open space at ground level together with connection to all services including all ancillary site works
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 8 Jan 2026
Timeline
Application received
5 Nov 2025
Decision due
8 Jan 2026
Decision: unconditional
8 Jan 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (housing or apartment development) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
housing or apartment development
the demolition of existing residence and the construction of a three storey premises containing 7 no. one bed apartments inclusive of archway to the rear, car p
35 Cannon Row, Navan, Co Meath · refused 17 Jan 2025 · about 200 m away · 24438
housing or apartment development
the demolition of existing residence and the construction of a three storey premises containing 7 no. one bed apartments inclusive of archway to the rear, car p
35 Cannon Row, Navan, Co Meath · refused 9 Nov 2023 · about 200 m away · 23896
housing or apartment development
the demolition of existing residence and the construction of a three storey premises containing 7 No. one bed apartments inclusive of archway to the rear, car p
35 Cannon Row, Navan, Co. Meath · refused 29 Mar 2023 · about 200 m away · 23104
housing or apartment development
demolition of existing residence and the construction of a three storey premises containing 8 No. one bed apartments inclusive of archway to the rear, car parki
35 Cannon Row, Navan, Co. Meath · refused 14 Apr 2022 · about 200 m away · 21584
Planning history within 750 m
the retention and continuance of the use permanently of the existing car park with existing entrance fronting onto Kennedy Road and the rear of Cannon Row
the development will consist of the retention of renovations and alterations to the existing two storey building, a new pitched roof to the rear, all elevational changes and all associated site works. The site is located within Navan Historic Core Architectural Conservation Area
The development will consist of the retention of renovations and alterations to the existing two storey building, a new pitched roof to the rear, all elevational changes and all associated site works. The site is located within Navan Historic Core Architectural Conservation Area.
the development will consist of a of change of use from a retail unit outlet to a restaurant and fast food takeaway with associated signage together with connections to all existing services including all ancillary site development works
the development will consist of the change of use of the unit from office to health centre with associated internal reconfiguration works to facilitate this use, signage to the unit’s front/northern elevation, and all associated site works necessary to facilitate the development
for the installation of a 1.42m x 0.51m x 1.81m (LxWxH) above ground enclosure to house a new natural gas District Regulating Installation (DRI) including a 3m high ‘lamp post’ style relief vent stack with all ancillary services and associated site works at Blackwater Heights, off New Lane, Navan, Co. Meath