With the townlands of Ferganstown and Ballymacon and Athlumney, Navan, Co Meath
Proposed development
For amendments to previously granted permission by An Bord Pleanala ABP-312746-22 (Meath County Council reference 211046) for development within the townlands of Ferganstown, Ballymacon & Athlumney, Navan, Co. Meath. Significant further information/revised plans submitted on this application The alterations will consist of the following: o Internal bicycle and bin store at ground floor of apartment block relocated externally within separate enclosures. o Existing space at ground floor for bicycle and bin store replaced with 1no. 1 bed apartment and plant room. o Alterations to façade to accommodate amendment from bin and bicycle store to apartment and plant room. o Alterations to select windows on south elevation for compliance with TGD Part B. o General updates to window fenestration.
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 23 Jun 2025
Timeline
Application received
20 Dec 2024
Council asked for further information
21 Feb 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
31 Mar 2025
Decision due
23 Jun 2025
Decision: conditional
20 Jun 2025
Grant issued
7 Aug 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
retention for (a) small garage attached to the main dwelling and (b) garden shed structure in the rear garden and all associated site works
the development will consist of the building of 3 No. two storey dwellings & entrances and for all associated siteworks, including watermain & foul sewer connections
The development will consist of the construction of an estate road and access roads extending northwards from the section of road permitted under Meath County Council Reg. Ref. 22/1703 and ACP Ref. 318533-23 (currently under construction), connecting to Roundabout 3 of Local Distributor Road 6 (LDR6), to facilitate access to the Boyne Village Enterprise Lands. The development includes drainage and utility services infrastructure, landscaping, pedestrian and cycle facilities, road signs and markings, public lighting, modifications and enlargement (reduce base level by c. 200mm) and widening of the attenuation pond located within the south-eastern corner of the site, and all associated and ancillary site development works. A Natura Impact Statement will be submitted to the planning authority with the application
For the demolition of the existing two bedroom single storey detached dwelling and the construction of 5no. dwellings comprising 1no. detached two storey 3 bedroom dwelling and 4no. terraced two storey 3 bedroom dwellings along with associated boundary treatments, roads, car parking, bin storage and all other ancillary site development works on their lands adjacent to the previously approved scheme of 93 no. residential units granted permission under Reg Ref: 22/1008 (Boann Weir)
For the demolition of the existing two bedroom single storey detached dwelling and the construction of 5no. dwellings comprising 1no. detached two storey 3 bedroom dwelling and 4no. terraced two storey 3 bedroom dwellings along with associated boundary treatments, roads, car parking, bin storage and all other ancillary site development works on their lands adjacent to the previously approved scheme of 93 no. residential units granted permission under Reg Ref: 22/1008 (Boann Weir) at Boyne Road, Athlumney, Navan, Co. Meath.
• The construction of a two-storey (building height of c. 15.5m above ground level) industrial laundry processing and distribution facility warehouse (with a gross floor area (GFA) of c.10,514 sq.m), including: a ground floor warehouse and processing area of c.9,000 sq.m; a mezzanine level of c. 1,514 sq.m (including ancillary offices, storage, and staff amenities) with backlit signage extending to 22.5 sqm on the eastern elevation; • Vehicular access to the site will be via roundabout 3 at the Local Distributor Road 6 and the existing and permitted estate roads at Boyne Village Business Park estate roads; • Parking and loading facilities including: 107 staff car parking spaces (102 standard, 5 accessible) with 1 set-down space, 30 bicycle parking spaces, 19 truck parking spaces and 20 van parking spaces, 10 truck loading bays and 12 van loading bays; • Ancillary structures and services including single storey ESB substation (c. 22 sq.m), sprinkler system pump room (c. 40 sq.m), sprinkler attenuation tank, external water tank, external CO2 tanks and gas skid; • Site boundary works, landscaping, roads and drainage infrastructure (including foul and surface water drainage and attenuation measures and extension of estate road) as well as all other ancillary and associated development works. A Natura Impact Statement will be submitted to the planning authority with the application. Significant further information/revised plans submitted on this application