Lands at, City North Business Campus, Stamullen
Proposed development
The development will consist of amendments to An Bord Pleanala permission reference 312771-22 to consist of the following: 1. Removal of condition 3 which states ‘The buildings hereby permitted, and all activities occurring therein, shall only operate between 0700 hours and 2100 hours, Monday to Friday and between 0700 and 1430 hours on Saturdays. No activity shall take place outside these hours or on Sundays or public holidays.’ 2. Amendments to the site boundary. 3. Amendments to the design and layout of units 10, 12 and 13. 4. Provision of an acoustic berm and associated landscaping works. 5. Amendments to the site layout. 6. Omission of the temporary wastewater treatment plant with connections made to the public mains for wastewater services. 7. Associated site works to include for revised parking, loading and turning areas along with drainage, landscaping, external lighting.’
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 21 Feb 2025
Timeline
Application received
19 Dec 2024
Decision due
21 Feb 2025
Decision: conditional
20 Feb 2025
Grant issued
7 Apr 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
planning permission for an attic conversion with dormers to rear and side roof to accommodate stairs to allow access to attic as non habitable storage space with roof windows to front. window to gable. Permission for boundary wall with metal railing and brick pillars to side and metal railing to front to match surrounding. All with associated ancillary works
attic conversion with dormer to side of roof and dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof window to front all with associated ancillary works
the proposed development will consist of high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 12no. electric vehicle charging bays with 6no. charging units and associated signage, II. Installation of proposed 2no. power cabinets, III. Installation of proposed modular substation, IV. Erection of totem signage, V. All associated site development works including surfacing, lighting & line marking
Planning Permission for attic conversion with dormer to side of roof and dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof window to front all with associated ancillary works
an attic conversion with dormers to rear and side roof to accommodate stairs to allow access to attic as non habitable storage space with roof windows to front, window to gable. Permission for boundary wall with metal railing and brick pillars to side and metal railing to front to match surrounding. All with associated ancillary works