22 Mullaghboy Industrial Estate, Navan, Co Meath
Proposed development
The retention and completion of indoor golf bays, putting green, kitchen and toilets. Planning permission for the change of use of part of the premises to a break out and dining area, staff canteen, staff room, office and storage
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 22 Feb 2025
Timeline
Application received
20 Dec 2024
Decision due
22 Feb 2025
Decision: conditional
20 Feb 2025
Grant issued
7 Apr 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development will consist of the construction of a new storey and a half extension with single storey extensions to the side and rear of the existing single storey dwelling, conversion of the existing hipped roof to a gable ended roof, demolition of the existing extension to the rear and attached garage to the side of the existing dwelling, renovations and alterations to the existing dwelling including elevational changes and revisions to the site layout plan, new detached garage, decommissioning of the existing septic tank, and upgrade to a new wastewater disposal system, and all associated site works
new single storey extension to rear of existing dwelling
demolition of an existing warehouse and lean to open shed currently used for the storage of building materials and its replacement with a new retail warehouse, including ancillary offices and outdoor garden centre area to be used as a builder provider/hardware store and the change of use of the existing builder provider/hardware store to a warehouse solely for the storage of building materials and all including 3 No flag poles, a totem sign, car parking, landscaping, new front boundary railings, entrance gate and ancillary siteworks
alterations to a previously granted planning permission register reference number 23/625 (the proposed residential development will consist of the construction of 97 no. dwellings, comprising 53 no. houses (47 x 3 bed and 6 x 4 bed houses) and 44 no. Duplex units (22 x 2 bed and 22 x 3 bed units). The formation of two new road junctions onto Commons Road (to the west) of which the southern junction will extend eastwards along the Southern site boundary to deliver a c. 210m long western section (first phase) of LDR2(a) link road that will ultimately connect to Trim Road to the west. The northern junction will be formed by an internal distributor road that will extend southwards to form a junction onto the proposed LDR2(a) link road. Associated road infrastructure works include the delivery of access roads, pedestrian footpaths and cycle tracks, green verges and street lighting. Other associated infrastructure works include foul and surface water drainage, water supply, attenuation areas, temporary foul pumping station; ESB sub-station; bin stores; bicycle stores and a landscaped public open space (4,800 sq.m); boundary walls and fences, site landscaping; 163 no. car parking spaces and 154 no. bicycle parking spaces together with all other associated site development works); the alterations to include the following: • Amendments to the as granted site layout to include for revised boundary treatments and landscaping works to the Creche building; • Revisions to the number of children to be accommodated in the pre-school / childcare facility to be increased from the as granted 82 to 106 in any session; • Variation of the as granted operational hours from 08:30 – 17:30 from Monday to Friday to 07:00 – 18:30 Monday to Friday; with all associated site development works
Alterations to a previously granted planning permission register reference number 23/625 (the proposed residential development will consist of the construction of 97 no. dwellings, comprising 53 no. houses (47 x 3 bed and 6 x 4 bed houses) and 44 no. Duplex units (22 x 2 bed and 22 x 3 bed units). The formation of two new road junctions onto Commons Road (to the west) of which the southern junction will extend eastwards along the Southern site boundary to deliver a c. 210m long western section (first phase) of LDR2(a) link road that will ultimately connect to Trim Road to the west. The northern junction will be formed by an internal distributor road that will extend southwards to form a junction onto the proposed LDR2(a) link road. Associated road infrastructure works include the delivery of access roads, pedestrian footpaths and cycle tracks, green verges and street lighting. Other associated infrastructure works include foul and surface water drainage, water supply, attenuation areas, temporary foul pumping station; ESB sub-station; bin stores; bicycle stores and a landscaped public open space (4,800 sq.m); boundary walls and fences, site landscaping; 163 no. car parking spaces and 154 no. bicycle parking spaces together with all other associated site development works); the alterations to include the following: • Amendments to the as granted site layout to include for revised boundary treatments and landscaping works to the Creche building; • Revisions to the number of children to be accommodated in the pre-school / childcare facility to be increased from the as granted 82 to 106 in any session; • Variation of the as granted operational hours from 08:30 – 17:30 from Monday to Friday to 07:00 – 18:30 Monday to Friday; with all associated site development works
retention permission for existing rear extension and revised roof on existing dwelling and planning permission for proposed bedroom extension to rear with lobby/snug, proposed replacement w.w.t.s and percolation area, including all ancillary site works