Pike Cormer, Kilmessan, Co Meath (within the townlands of Ardbrackan or Wrightown)
Proposed development
The renovation and remodel of the existing cottage with the construction of a linked extension to the rear of the cottage including a new proprietary wastewater treatment system and percolation area, with connection to all existing services together with all ancillary site development works
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 20 Feb 2025
- Residential units
- 1
- Floor area
- 200.5 m²
Timeline
Application received
18 Dec 2024
Decision due
20 Feb 2025
Decision: conditional
14 Feb 2025
Grant issued
27 Mar 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the renovation and remodel of the existing cottage and the construction of an extension to the rear of the cottage with connection to all existing services including a new proprietary wastewater treatment system and percolation area together with all ancillary site development works
the development consists of converting existing detached garage incorporating master bedroom, en-suite & wall-in closet, connecting to the existing dwelling with small extension between the dwelling and the existing garage, changes to window type and fenestration to front and rear of the existing dwelling, two new windows at side elevation
the development consists of converting existing detached garage incorporating master bedroom, en-suite & toilet, connecting to the existing dwelling with small extension between the dwelling and the existing garage
alterations to the garage elevations previously approved under planning permission Ref: TA/170305. The alterations relate to the garage windows and doors
a single storey extension to the rear of an existing dwelling and for retention of the upgrading of and change of window style to the existing dwelling
construction of a part two storey / part single storey dwelling, associated domestic garage, open new vehicular entrance to site, new mechanical aeration system and polishing filter, new private water well, together with all associated site development works