Newtown Beaupark, Navan, Co. Meath
Proposed development
1) construct a single storey domestic extension to the northern gable side of existing dwelling house, and 2) all associated site services.
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 6 Dec 2023
- Residential units
- 1
- Floor area
- 71 m²
Timeline
Application received
12 Oct 2023
Decision due
6 Dec 2023
Decision: conditional
6 Dec 2023
Grant issued
25 Jan 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
consists of a detached one-and-a-half-storey domestice home office and storage building and associated works
the development will consist of a single storey detached garden room to the rear of the property for uses ancillary to the residential use of the existing dwelling
to construct a single storey extension to the side and rear of existing dwelling house, new wastewater treatment system and percolation area and all associated site development works. Significant further information/revised plans submitted on this application
planning permission for the following: 1) construct a single storey domestic extension to the northern gable side of existing dwelling house, and 2) all associated site services
The proposed development will consist of an uprate of the existing Gorman to Platin 110 kV Overhead line (OHL) (19.76 km long and comprising 109no. supporting structures between the existing Gorman substation in the townland of Causetown, Co. Meath and the existing Platin 110kV substation in the townland of Platin, Co. Meath). The proposed project is located within the townlands of Graigs, Ardmulchan, Dollardstown, Dunmoe, Carranstown, Platin, Haystown and Carnuff, Stackallan, Harmanstown, Causetown, Garballagh, Commons, Downestown, Gillinstown, Longford, Rathdrinagh, Painestown, Thurstianstown, Knockcommon, Drumman, Laugher, Newtown and Platin.The proposed uprate project will comprise: • the replacement ("restringing") of the existing OHL circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the replacement of 42no. existing polesets - any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, will be along the same alignment as existing, and will be of a similar height and appearance; • the replacement of steel members at 8no. steel angle masts; • replacement of hardware and fittings at all structure locations; • replacement and relocation of fibre communication structures; • all associated site development works; • Earthwire to be replaced between Angle Mast 94 and End Mast 108; • Tower painting at 10no. steel Angle/End masts; • foundation strengthening works at 4no. Angle Masts; • Anti-climbing guards to be installed at lno. location; • all associated works within the existing Gorman substation and Platin 110 kV substation to accommodate the uprated 110 kV overhead line including alterations to existing apparatus; • all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts/ piers and removal and reinstatement of existing fencing; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings.....
a 2 Storey Residence, Tertiary Treatment System and Infiltration/treatment area to EPA Standards, Domestic Entrance and drive way, together and all associated Site Works