Hawkinstown & Cushinstown, Garristown, Co. Meath
Proposed development
The importation and insertion of c.56,997 tonnes of excavation spoil, over a three-five year period and not exceeding 25,000 tonnes in a single year. The excavation spoil comprises of natural inert materials of clay, soil, silt, sand, gravel and stone for infilling and recontouring purposes for agricultural improvement. On site equipment includes: - Site wheel wash; - Mobile portacabin welfare facilities; - Material inspection and quaratine area; There is no planned removal of hedge line vegetation on the perimeter of the site. Significant further information/revised plans submitted on this application
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 26 Oct 2023
Timeline
Application received
10 Feb 2023
Council asked for further information
30 Mar 2023
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
24 Aug 2023
Decision due
26 Oct 2023
Decision: conditional
25 Oct 2023
Grant issued
7 Dec 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development will consist of an amendment to the previously granted two storey dwelling house granted under Planning Registry Reference 24/407, the amendment will consist of a single storey orangery to the side of the house inlieu of the original proposed bay window
the construction of a two storey, detached, farm dwelling house, detached garage with plant room and storage, new vehicular entrance at the location of the existing field gate, hedgerows on either side to be cut back or set back as necessary, new internal access road, new wastewater treatment unit and percolation area along with all associated services, service connections, landscape and site development works
the importation and insertion of c.56,997 tonnes of excavation spoil, over a three-five year period and not exceeding 25,000 tonnes in a single year. The excavation spoil comprises of natural inert materials of clay, soil, silt, sand, gravel and stone for infilling and recontouring purposes for agricultural improvement. On site equipment includes: - Site wheel wash; - Mobile portacabin welfare facilities; - Material inspection and quaratine area; There is no planned removal of hedge line vegetation on the perimeter of the site
a two storey dwelling, domestic garage, vehicular entrance, waste water treatment system and all associated site works
a two storey dwelling, domestic garage, vehicular entrance, waste water treatment system and all associated site works
a two storey dwelling, domestic garage, vehicular entrance, waste water treatment system and all associated site works