Screeboge, Moynalty, Co. Meath
Proposed development
The development will consist of; (1) the restoration of lands for the purposes of agricultural gain through the importing and depositing of inert material comprising natural minerals of clay, silt, sand, gravel or stone and (2) all ancillary site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The proposed development will require a "Waste Facility Permit" which will be sought through a separate application to Meath County Council. Significant further information/revised plans submitted on this application
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 30 May 2023
Timeline
Application received
14 Apr 2022
Council asked for further information
7 Jun 2022
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
13 Mar 2023
Decision due
30 May 2023
Decision: conditional
26 May 2023
Grant issued
6 Jul 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Previous Reference 21725 - the development consists of the following (1) to construct a single storied dwelling house and a detached domestic garage (2) to install a proprietary waste water treatment unit and percolation area (3) to make a new entrance onto the road to serve the new development (4) and complete all ancillary site development works
the development will consist of the importation of inert soil and stone material to in-fill and re-contour the subject site at Screeboge, Moynalty, Co. Meath. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The applicant proposes, subject to planning, to import inert soil and stone material to remediate approximately 1.15 ha of the total site. The 1.15 hectares (ha) is divided into four distinct phases: Phase 1 is 0.16ha, Phase 2 is 0.25ha, Phase 3 is 0.34ha and Phase 4 is 0.40ha. A plan has been drawn up for the infilling of approximately 6,827.805 tonnes to fill Phase 1, 1,5843 tonnes to fill Phase 2, 57,868.5 tonnes to fill Phase 3, and 42,702 tonnes to fill Phase 4, equating to 123,241.31 tonnes. 7079.4 tonnes of material is currently on site and it is intended to use this material during the infilling process. A total of 116,161.5 tonnes of imported inert soil and stone material is required on site. Planning permission is being sought for a period of 5-year period. This equates to the importation of 23,232.3 tonnes of inert soil and stone material per year. A Natura Impact Statement will be submitted to the Planning Authority with the application. Permission is being sought for a 5-year period and will be subject to a waste facility permit
the following: (1) retention of a basement level construction to the rear of the dormer type dwelling house, to include a car port, domestic store, games room area and a balcony at ground floor level (2) minor variations to the elevations of the dwelling, the site boundaries and the site layout from all previously granted under planning ref. KA/60139 (3) and all ancillary site development works
the development will consist of; (1) the restoration of lands for the purposes of agricultural gain through the importing and depositing of inert material comprising natural minerals of clay, silt, sand, gravel or stone and (2) all ancillary site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
the development will consist of alterations to existing dormer style dwellinghouse to include for 1: the erection of a storey and half extension to the front and rear and 2: a single storey extension to the rear to connect to existing detached garage. Also for retention of 1: minor variations to existing garage and 2: relocation of site entrance. Previous File Ref. No. KA40507
the development will consist of alterations to existing dormer style dwellinghouse to include for 1: the erection of a storey and half extension to the front and rear and 2: a single storey extension to the rear to connect to existing detached garage. Also for retention of 1: minor variations to existing garage and 2: relocation of site entrance. Previous File Ref. No. KA40507