Forde De Fyne, Naul, Co Meath K32 X066

Not open for objections: The council has already decided this application.

Proposed development

Partial demolition of existing dwelling, new 2 storey extension with single storey link to existing dwelling, new 2 bay garage with home office in loft, replace existing septic tank with proprietary waste water treatment system, SuDS drainage and all associated site works. Significant further information/revised plans submitted on this application

Applicant
Not published
Authority
Meath County Council
Decision due
28 Jun 2022
Residential units
1
Floor area
305 m²
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    14 Mar 2022

  2. Council asked for further information

    6 May 2022

  3. Further information received. If the council treats it as significant, a new submission period opens (check the council's file)

    20 May 2022

  4. Decision due

    28 Jun 2022

  5. Decision: conditional

    22 Jun 2022

  6. Grant issued

    8 Aug 2022

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2461041Under appeal

Extraction and processing on site, to include washing (with associated closed recycled washing plant and lagoon system), screening and crushing plant; storage; stockpiling and haulage of sand and gravel to service the existing readymix concrete plant operated by Kilsaran on the eastern side of the R108 regional road and permitted under P. Ref. 80/572 & 22/153 (ABP-314881-22); The total extraction proposal extends to an area of c. 6.2 hectares and will be worked (extracted and restored) on a phased basis for a period of 11 years plus 1 year to complete final restoration works (total duration of 12 years); Phased stripping and storage of topsoil and overburden materials for reuse in the restoration works. Restoration of the site will be to a beneficial agricultural after-use; • Access to the site will be through the existing agricultural enterprise site entrance onto the R108 regional road with upgrade of same to consist of setting-back of the existing boundary wall to the north of the site access, and provision for the upgrade of the existing internal access track and sections of a new access track which will include a new weighbridge; and All associated site ancillary works within an overall application area of c. 14.9 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application

Naul Townland, Ford-de-Fine Naul, Co. Meath Meath County Council Received 29 Nov 2024
F21A/0107Granted

The refurbishment and reuse of an existing vernacular dwelling house a

Westown, Naul, Co Dublin Fingal County Council Received 27 Jan 2022
F21A/0514Granted

Construction of new single storey garage to the rear and side of the p

Iona, Westown, Naul, Co. Dublin, K32 HX08 Fingal County Council Received 24 Sept 2021
F21B/0169Granted

Construction of new single storey extension and creation of new single

Iona, Westown, Naul, Co. Dublin, K32HX08 Fingal County Council Received 10 Aug 2021
F19B/0311Granted

a) Two storey extension to the side and rear of existing dwelling with

Westown, Naul, Co Dublin, K32 CH96 Fingal County Council Received 18 Sept 2020
AA191263Refused on appeal

the development will consist of: Extraction and processing on site, to include washing (with associated closed system silt settlement lagoons), screening and crushing; storage; stockpiling and haulage of sand and gravel to principally service the existing readymix concrete plant operated by Kilsaran Concrete on the eastern side of the R108 regional road and permitted under P. Ref. 80/572; The total extraction area extends to an area of c.6.9 hectares and will be worked (extracted and restored) on a phased basis; Phased stripping and storage of topsoil and overburden materials for reuse in the restoration works. Restoration of the site will be to a beneficial agricultural after-use; Access to the site will be through the existing agricultural enterprise site entrance onto the R108 regional road with upgrade of same and provision for the upgrade of the existing internal access track and section of a new access track; All associated site works within an overall application area of c.17 hectares, and all for a period of 9 years plus 1 year to complete restoration works (total duration of 10 years). An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application

Ford-de-Fine, Naul, Co. Meath Meath County Council Received 24 Sept 2019