Callow, Foxford, Co. Mayo
Proposed development
The development will consist of the (1) demolition of existing dwelling house and shed, (2) construction of a replacement dwelling house with attached independent living unit, (3) upgrading of existing wastewater treatment system with new treatment plant and soil polishing filter, and all associated site works
- Applicant
- Not published
- Authority
- Mayo County Council
- Decision due
- 16 Apr 2026
Timeline
Application received
20 Feb 2026
Decision due
16 Apr 2026
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
construction of a new dwelling house, septic tank and percolation area along with ancillary site works
The development will consist of the (1) demolition of existing dwelling house and shed, (2) construction of a replacement dwelling house with attached independent living unit, (3) upgrading of existing wastewater treatment system with new treatment plant and soil polishing filter, and all associated site works
Upgrade of raw water pumps and controls, modification of underground tanks to provide a dedicated raw water tank, installation of equipment to improve process including a new flocculation tank, clarification tank, dissolved air flocculation. UV reactor dedicated chemical delivery area, and associated pumps, piping and valves and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Installation of new concrete slab and installation of new sludge holding tank (45m3), settlement tank, sludge balancing tank, alum tank, DAF and all associated ancillary works and associated engineering works. Works also include the installation of pumps and pipework to the treated water storage tank including a scrubber within the Callow Water Reservoir site
(1)Retention and change of use of 1 No. residential dwelling to short term letting unit and (2) Change of use of 3 No. residential dwellings to 3 No. short term letting units together with all associated site works.
Section 5 Declaration; Emergency Accommodation
CONSTRUCT A DWELLING HOUSE, WITH PETU AND ALL ASSOCIATED SITE DEVELOPMENT WORKS