CUING BEG, PONTOON, CO MAYO
Proposed development
SINGLE STOREY DWELLING HOUSE AND SHED, AND WASTEWATER TREATMENT SYSTEM, SOIL POLISHING FILTER, INCLUDING NEW ACCESS ROAD AND ALL ASSOCIATED SITE SERVICES AND LANDSCAPING WORKS
- Applicant
- Not published
- Authority
- Mayo County Council
- Decision due
- 24 Feb 2022
Timeline
Application received
22 Dec 2021
Decision due
24 Feb 2022
Decision: refused
23 Feb 2022
Appeal decided: refused (313116-22)
14 Jun 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
To Construct new single storey dwellinghouse and domestic garage (2): Install on site waste water treatment system and (3): Carry out all Ancillary Site Works including upgrade to existing Right of Way
change of house type/design and minor elevational changes to that granted under previous planning permission reference P23/508 and all ancillary works
retain extension to dwelling house
Planning Permission to (a) make elevational changes to dwelling house previously granted under planning reference PL22/904 (b) Raise the proposed finished floor level by 0.900metres to 11.60metres. Previous finished floor level granted under PL22/904 was 10.70 metres, together with all ancillary site works and services at Tawnaghmore, Pontoon, Foxford, Co.Mayo.
Planning Permission to (a) make elevational changes to dwelling house previously granted under planning reference PL22/904 (b) Raise the proposed finished floor level by 0.900metres to 11.60metres. Previous finished floor level granted under PL22/904 was 10.70 metres, together with all ancillary site works and services at Tawnaghmore, Pontoon, Foxford, Co.Mayo.
removal of existing roof and building up to walls, building replacement roof and construction of a new extension to an existing dwelling house and a new boathouse, upgrading of the existing foul water system to a new onsite wastewater system and all ancillary works