LISMORAN TD., FOXFORD, CO. MAYO
Proposed development
RETAIN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE (PREVIOUSLY GRANTED UNDER P05/3391) TOGETHER WITH ASSOCIATED GROUND EQUIPMENT WITHIN A FENCED COMPOUND
- Applicant
- Not published
- Authority
- Mayo County Council
- Decision due
- 13 Jan 2022
Timeline
Application received
10 Nov 2021
Decision due
13 Jan 2022
Decision: conditional
7 Jan 2022
Grant issued
10 Feb 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Upgrade of raw water pumps and controls, modification of underground tanks to provide a dedicated raw water tank, installation of equipment to improve process including a new flocculation tank, clarification tank, dissolved air flocculation. UV reactor dedicated chemical delivery area, and associated pumps, piping and valves and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Installation of new concrete slab and installation of new sludge holding tank (45m3), settlement tank, sludge balancing tank, alum tank, DAF and all associated ancillary works and associated engineering works. Works also include the installation of pumps and pipework to the treated water storage tank including a scrubber within the Callow Water Reservoir site
(1)Retention and change of use of 1 No. residential dwelling to short term letting unit and (2) Change of use of 3 No. residential dwellings to 3 No. short term letting units together with all associated site works.
Section 5 Declaration; Emergency Accommodation
A 3 metre extension on top of an exisitng 30 metre lattice telecommunications support structure (previously granted permission under planning reference P21/1181) to give an overall structure height of 33 metres together with antennas, dishes, associated equipment, ground-based equipment cabinets and all associated site development works for high-speed wireless data and broadband services
CONSTRUCT A 3 BAY OPEN SLATTED SHED WITH A FEED PASSAGE AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS