Toomes, Louth, Co. Louth
Proposed development
The development will consist of the renovation and extension of existing single storey dwelling, new site entrance gate and piers, the installation of new wastewater treatment plant, along with all associated site works.
- Applicant
- Not published
- Authority
- Louth County Council
- Decision due
- Not available
Timeline
Application received
1 Jul 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Retention permission for a domestic garage and associated site development works
Retention of timber cladding to front & sides of shop & toilets. Also for retention of mobile home to rear of shop/toilets SPLIT DECISION Grant Retention Permission for timber cladding to the front & sides of shop & toilets subject to the condition set out in Schedule 1 attached. 2. Refuse Permission for the retention of a mobile home to the rear of the shop and toilets for the reasons set out in Schedule 2 attached.
The development will consist of the renovation and extension of existing single storey dwelling, new site entrance gate and piers, the installation of new wastewater treatment plant, along with all associated site works. *Significant Further Information Received on 03/04/2026*
permission for development consisting of a 2-storey dwelling house, a domestic garage, a domestic waste water treatment system, a new site entrance with all associated site development works. Significant further information relates to alterations to house design along with repositioning and reorientation of the proposed dwelling on the site. Alterations to the garage design and the repositioning of the domestic garage along with alteration to the site boundaries
Permission for a 10 year planning permission for the construction of a solar PV and battery energy storage system development on a c.42.23ha site consisting of: (1) New site entrance, internal accesses and entrances and associated site works. (2) Solar panels on ground-mounted frames over an area of c.39.98ha, 15 no. single storey electrical inverter/transformer units, security fencing, CCTV system with pole mounted cameras and landscaping. (3) An enclosed battery energy storage system compound on c. 0.758ha consisting of 48 no. battery storage units (each with associated containerised step-up transformer). 1 no. containerised control room, 1 no. containerised switch room and 1 no. containerised switch gear unit. (4) 2 no. 37kv sub-stations each with an IPP building on c.1.4887ha, one serving the solar PV development, the other serving the battery energy storage system development. (5) 2 no. grid connections to Louth (Monvallet) 275kv substation. (6) A temporary construction compound and (7) All associated ancillary development works. The operational lifespan of the solar PV and battery energy storage system development will be 35 years. A Natura Impact Statement will accompany this application
Permission for a 10 year planning permission for the construction of: A solar PV and battery energy storage system development on a c.42.23ha site, consisting of: 1. New site entrance, internal access and entrances and associated works; 2. Solar panels on ground-mounted frames over an area of c.39.98ha, 15 no. single storey electrical inverter/transformer units, security fencing, CCTV system with pole mounted cameras and landscaping; 3. An enclosed batter energy storage compound on c0.758ha consisting of 48 no. battery storage units (each with associated containerised step-up transformer); 1 no. containerised control room, 1 no. containerised switch room and 1 no. containerised switch gear unit. 4. 2 no. 37kv sub-stations each with an IPP building on c.1.4887ha; one serving the solar PV development, the other serving the battery storage system development. 5. 2 no. grid connections to Louth (Monvallet) 275kv substation; 6. A temporary construction compound; and 7. All associated ancillary development works. The operational lifespan of the solar PV and battery energy storage system development will be 35 years. A Natura Impact Statement will accompany the application